Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 27, 2026 at 8:00 PM
Updated November 2, 2026
Renovation of an educational facility in Tempe, Arizona. Working plans call for the renovation of a educational facility.
“The owner has determined a prequalified list of construction managers. A Request for Proposals for CMaR is expected to be released in a future date.” Project Description a. Phase 1 of the ASU Utility Distribution Renewal project will provide critical utility infrastructure improvements to support current and future development on the Tempe Campus. The project will extend and enhance utility services to the new Tempe Campus Student Housing (TCSH) complex, improve the reliability and operational efficiency of the campus chilled water system, advance ASU's decarbonization efforts through the transition from steam to hot water utility distribution, and extend the ASU Technology dedicated duct bank infrastructure. b. The project will include, but will not be limited to, the installation of underground direct-buried chilled water and hot water piping, as well as the extension of the ASU Technology dedicated duct bank. New utility vaults will be constructed to facilitate connections to existing campus infrastructure and provide accessible points for utility distribution, maintenance, and future system modifications. Valve stations will also be incorporated into the utility distribution system to support connections to existing campus buildings, improve system isolation and operational flexibility, and accommodate future utility extensions as campus development progresses.The utility distribution improvements will require coordination with existing campus infrastructure and may involve modifications, rehabilitation, or selective improvements to existing utility tunnels to facilitate connections and tie-ins to the existing systems. The project will require coordination of utility shutdowns, tie-ins, phasing, and restoration activities to maintain continuity of campus services and support the safe and efficient completion of the work. c. The primary routing for the direct-buried utilities will be along Forest Avenue and Lemon Street. Construction within these corridors will require careful coordination of utility installation, excavation, traffic control, pedestrian access, and campus operations. The work will also include restoration of roadway and asphalt surfaces impacted by construction activities, with repairs performed as necessary to return the affected areas to an appropriate condition following completion of the utility installation. QA date - 10/01/2026 at 2:00 PM MT For purposes of this RFQ, the buyer is David Fleming, Dflemin2@asu.edu
Final Planning
$16,000,000.00
Public - State/Provincial
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 8, 2026
April 28, 2027
301 E. Orange Mall, Tempe, AZ
Related To This Project
Tempe, AZ
Bid Date: Nov 18 2026
Tempe, AZ
--
Tempe, AZ
Bid Date: Oct 21 2026
Tempe, AZ
Bid Date: Oct 06 2026
Tempe, AZ
--
Tempe, AZ
--
Tempe, AZ
--
Tempe, AZ
--
Tempe, AZ
Bid Date: Oct 06 2026
Tempe, AZ
--
Tempe, AZ
Bid Date: Sep 04 2026
Tempe, AZ
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed