Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 29, 2026 at 8:00 PM
Updated October 4, 2026
Site work and renovation of a bridge / tunnel in Linn, Missouri. Completed plans call for the renovation of a bridge / tunnel; and for site work for a bridge / tunnel.
Culvert replacement project Culvert Replacement - Street Crossing Project Remove and replace the existing stormwater culvert extending between two existing drop inlets beneath the roadway. Scope of Work The Contractor shall furnish all labor, equipment, materials, traffic control , excavation, dewatering, backfill , compaction , pavement restoration, and incidentals necessary to complete the work. Culvert Removal o Remove approximately 115 linear feet of existing culvert pipe between existing drop inlets. Properly dispose of all removed materials off-site. Culvert Installation Furnish and install 115 linear feet of 18-inch diameter culvert pipe. Pipe shall be: HDPE or approved equal. Install pipe at existing inlet and outlet invert elevations. Maintain continuous flow and positive drainage. Bedding Provide a minimum 6-inch compacted 1" clean rock bedding beneath and around the pipe. Shape bedding to uniformly support the pipe. Connections Connect new 18-inch pipe to the existing drop inlets using watertight connections. Seal all annular spaces with non -shrink grout and approved materials. Repair any damage to existing structures. Backfill and Compaction Backfill with approved select material . From the top portion of the culvert pipe until the street restoration material is put down, the cover material shall consist of 1 " base rock ( providing and maintaining a minimum of 12 inches of cover over the pipe prior to final pavement restoration) Place in lifts not exceeding 8 inches. Compact to a minimum of 95% Standard Proctor density. Pavement Restoration Replace roadway base and pavement to match existing section and thickness. Restore shoulders, ditches, and disturbed areas to original condition. Traffic Control o Contractor shall furnish and maintain all traffic control in accordance with MUTCD requirements. Maintain emergency vehicle access at all times. Utility Protection Contractor shall contact Missouri One Call prior to excavation. Contractor is responsible for protecting existing utilities and repairing any damage caused by construction activities. Measurement and Payment Lump Sum Bid Item: Culvert Replacement - Complete in Place Includes removal of existing culvert, excavation, 1 " clean rock bedding, 115 LF of 18- inch culvert pipe, inlet connections, 1" base rock backfill , compaction, traffic control, pavement restoration, cleanup, and all incidentals necessary for a complete installation .
Post-Bid
$900,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 28, 2026
October 28, 2026
N Ninth St, Linn, MO
Related To This Project
Linn, MO
Bid Date: Aug 14 2026
Linn, MO
Bid Date: Jun 01 2020
Linn, MO
Bid Date: Jul 07 2026
Linn, MO
Bid Date: May 18 2026
Linn, MO
Bid Date: May 14 2026
Linn, MO
Bid Date: Apr 14 2026
Linn, MO
--
Linn, MO
--
Linn, MO
--
Linn, MO
--
Linn, MO
Bid Date: Nov 14 2025
Linn, MO
--
Linn, MO
Bid Date: Jun 19 2025
Linn, MO
Bid Date: May 16 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed
