Site work and renovation of a theater / auditorium in Goodrich, Michigan. Completed plans call for the renovation of a theater / auditorium.

Goodrich Area Schools is seeking bids for the replacement of Theatrical Curtains and Rigging Upgrades for both Goodrich High School and Goodrich Middle School . Installation of auditorium draperies and rigging systems. Goodrich Area Schools High school - 8029 S Gale Rd . Goodrich, MI 48438 Goodrich Middle School - 7480 Gale Rd, Goodrich, MI 48438 Bonds: 5% Bid Bond, Certified Check required, 100% Performance Bond, 100% Payment Bond. Last Day to Submit RFIs: Monday, September 28th, 2026, by 3:00 PM Questions regarding this bid package should be directed to the Goodrich Area Schools at (810) 591-2250. Post Bid Interviews and Project Awards: Tuesday October 13th, 2026 - Wednesday, October 21st, 2026 The winning bidder is expected to make every attempt to install new draperies during December 2026. All work not completed in December 2026 must be completed by July 31st, 2027. Scope:- A. The Theatrical Rigging & Draperies Vendor, as part of the work of this section shall provide and install theatrical rigging and draperies as specified in Section 11 61 33 Appendix A. All rigging hardware, components, and installation practices must meet or exceed ETCP standards. B. The Theatrical Rigging & Draperies Vendor, as part of the work of this section , shall remove all existing stage curtains at Goodrich High School and Goodrich Middle School and store or dispose of the existing curtains as per the owner's instructions (See Drawings TR-1 & TR-2). C. The Theatrical Rigging & Draperies Vendor, as part of the work of this section, shall replace all existing stage curtains with new Curtains, using the sizes of the existing Curtains as a reference. Please note that the four (4) existing Downstage Legs at Goodrich High School will be replaced with curtains that are 5' wider than the existing legs. (See Section 116133 Appendix A). D. The Theatrical Rigging & Draperies Vendor, as part of the work of this section shall provide the stage curtains at Goodrich High School as follows: a. Main Valance - 25oz. Epic, 50% Fullness, Color TBD, 63'w x 7'h. b. Main Traveler - 25oz. Epic, 50% Fullness, Color TBD , 2 Panels each 36'w x 24'h. C. 4 Borders - 22oz. Prism, 50% Fullness, Black, 67'w x 9-6 " h. d. 4 Legs - 22oz. Prism, 50% Fullness, Black, 12'w x 24'h e. 2 Legs - 22oz. Prism, 50% Fullness, Black, 8'w x 24'h Mid Stage Traveler - 22oz. Prism, 50% Fullness, Black, 2 Panels each 36'W x 24'h. g. Up Stage Traveler - 22oz. Prism, 50% Fullness, Black, 2 Panels each 36'w x 24'h h. Cyclorama - Seamless Muslin , White, 67'w x 24'h. i . Cyc "Diaper" - Muslin, White, 70"W x 8'h E. The Theatrical Rigging & Draperies Vendor, as part of the work of this section, shall provide the following items at Goodrich High School: a. New Rope, Tensioner, & Pully system for operating Main Traveler. As per ETCP Standards. b. New Rope, Tensioner, & Pully system for operating Mid-Stage Traveler. As per ETCP Standards. C. New Rope, Tensioner, & Pully system for operating Upstage Traveler. As per ETCP Standards. F. The Theatrical Rigging & Draperies Vendor, as part of the work of this section , shall replace all traveler carriers on the Main Curtain, Midstage Traveler, and Upstage Traveler at Goodrich High School. G. The Theatrical Rigging & Draperies Vendor, as part of the work of this section , shall remove an existing scenic track (appx. 65' long) at Goodrich High School from Pipe #11 , so that it can be converted to an electric pipe (See Drawings TR-2 & TR-3). H. The Theatrical Rigging & Draperies Vendor, as part of the work of this section, shall remove existing "4th Leg Tracks" and store as per the Owner's instructions. I. The Theatrical Rigging & Draperies Vendor, as part of the work of this section , shall relocate the Upstage Traveler at Goodrich High School (including the pipe and all required rigging), downstage to the position presently occupied bt the "4th Leg Tracks" (See Drawings TR-1, TR-2 & TR-3). J. The Theatrical Rigging & Draperies Vendor, as part of the work of this section shall provide the following stage curtains at Goodrich Middle School: a. Main Valance - 25oz. Epic, 50% Fullness, Color TBD, 54'w x 3'h. b Main Traveler - 25oz. Epic, 50% Fullness, Color TBD, 2 Panels each 27'w x 18'h. C. 3 Borders - 22oz. Prism, 50% Fullness, Black, 54'w x 3'h. d. 4 Side Tabs - 22oz. Prism, 50% Fullness, Black, 10'w x 18'h e. Up Stage Curtain - 22oz. Prism, 50% Fullness, Black, 2 Panels each 27'w x 18'h. K. The Theatrical Rigging & Draperies Vendor, as part of the work of this section, shall provide the following items at Goodrich Middle School: a. New Rope & Pully system for operating Main Traveler. As per ETCP Standards. L. The Theatrical Rigging & Draperies Vendor, as part of the work of this section , shall furnish all Required Rigging Cables, Unistrut, Thread Rod , Hardware (as per specification and code), and other incidental items not specified in section 116133 Appendix A, but necessary for the completion and proper operation of the static ("Dead Hung") rigging systems at both schools. M. The Theatrical Rigging & Draperies Vendor, as part of the work of this section, shall convert Pipe #16 (The newly designated "Cyclorama Pipe") from Dead Hung to Automated by installing a Thern "Pilewind" Hoist System (See Section 11 61 33 Appendix A and Drawings TR- 1 , TR-2. & TR-3). N. The Theatrical Rigging & Draperies Vendor, as part of the work of ADDER #1 , shall convert existing Pipe #11 from Dead Hung to Automated by installing a Thern "Pilewind" Hoist System (See Section 11 61 33 Appendix A and Drawings TR- 1 , TR-2. & TR-3). This pipe will be a new dedicated "3RD ELECTRIC" pipe. O. The Theatrical Rigging & Draperies Vendor, as part of the work of ADDER #2, shall convert existing Pipes #5 & #9 from Dead Hung to Automated by installing a Thern "Pilewind" Hoist Systems (See Section 11 61 33 Appendix A and TR- 1 , TR-2 . & TR-3). These pipes will remain dedicated scenery pipes. P. The Theatrical Rigging & Draperies Vendor, as part of the work of The Base Bid, ADDER #1 , and ADDER #2 shall collaborated with the Project Electrical Contractor on the appropriate installation of Thern "Pilewind" systems. Q. The Theatrical Rigging & Draperies Vendor, as part of the work of this section, shall test all new installations. R. The Theatrical Rigging & Draperies Vendor, as part of the work of this section, shall supply all required permits for all facets of the rigging upgrade project. S. The Theatrical Rigging & Draperies Vendor, as part of the work of this section , shall supply Ariel Work Platforms or appropriate scaffolding for use by the Theatrical Rigging & Draperies Vendor during the installation. T. The Theatrical Rigging & Draperies Vendor, as part of the work of this section, shall install all static (Dead Hung) Pipes, Curtain Tracks, and Curtains as per Drawings TR- 1 , TR-2, & TR-3, using appropriately rated hardware. The installer shall use Unistrut in conjunction with the building's structural steel to safely and appropriately locate hang points for what is to be hung. All rigging hardware, components, and installation practices must meet or exceed ETCP standards.

Post-Bid

$2,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
340
Active Projects
143
Bidding Soon
2,338
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 12, 2026

December 1, 2026

Project location map

Multiple Locations, Goodrich, MI


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed