Demolition, site work, paving and new construction of a water / sewer project in Salt Lake City, Utah. Completed plans call for the construction of a water / sewer project; and for the demolition of a water / sewer project.

This project includes installation of a gravity sanitary sewer with a trenchless crossing beneath SR-85 (Mountain View Corridor) within UDOT Region 2 right-of-way. The Work includes, but is not limited to, installation of 10-inch and 18-inch PVC gravity sanitary sewer pipe ; trenchless installation of a 36- inch-diameter steel casing with carrier pipe beneath Mountain View Corridor (State Route 85); excavation, construction, and backfilling of launch, retrieval , and intermediate shafts; installation of new 60-inch-diameter lined sanitary sewer manholes; connection to the existing sanitary sewer system; abandonment and removal of existing sewer infrastructure; surface restoration, including pavement, curb and gutter, sidewalk, and striping; traffic control within UDOT right-of-way; sanitary sewer bypass pumping as required ; and all related appurtenances and incidental work necessary to complete the Project in accordance with the Contract Documents. 13800 South Mountain View Corridor Sewer Project (BCA) 500 If 18-inch PVC Sewer 434 If trenchless construction guided bore (36-in steel casing) 31 feet maximum sewer depth excavation Critical Issues: Permits: UDOT, Riverton , Herriman, County Survey Monument (if required) Sewer Depth and Shoring - See Specification 31 75 00 for shoring design requirements provided by the Contractor Sewer bypass pumping see Sanitary Sewer Project Note 12, Dwg No. G05 Optional intermediate bore pit (see Dwg No. C-02) Winter work allowed during Oct 15 to April 15 with temp asphalt placed in the winter and permanent asphalt placed in the spring (see UDOT Proj Note 4.A, Dwg No. G-05) Traffic Control see UDOT Project Note 4.B Dwg No. G-05 and General Note 23, Dwg No. G-04 Surface Restoration see General Notes 19 and 20, Dwg No. G-04 Construction staking, survey as-builts, pipe and manhole testing provided by Contractor (third party). Compaction testing and CCTV inspection will be provided by JBID 13200 South Mountain View Corridor Sewer Project (JUB) 1328 If 18-inch PVC Sewer 121 If 10-inch PVC sewer 534 If trenchless construction guided bore (36-in steel casing) 28 ft maximum sewer depth excavation Review Drawings Main Points: Slope Stability Analysis required for work within Riverton City Slope Easement (on Costco Property) Permanent Easements have not been recorded, and executing the Agreement will be held until easements are secured. It is the responsibility of the contractor to secure staging and access within the Suburban Land Reserve Property. Initial conversations have been initiated with Suburban Land Reserve, access will be allowable pending negotiations. Bid Item 34 was included to cover potential costs associated with securing temporary access. GEI Technical Specs: 31 09 13, 31 71 00, 31 73 00, 31 74 23, 31 75 00 Contractor will need to submit: Requirement of Engineered, Stamped Shoring for all excavations over 20-ft in depth Slope Stability Analysis for Riverton City Monitoring Arrays: along MVC and 13200 S. See Spec 31 09 13 Traffic Control Plan will need to be reviewed and approved by UDOT Region 2 and Herriman City. Shoulder closured along MVC are allowable at any time. See specification 01300 & 01500 Question Deadline 10/08/2026 at 5:00 PM MT All questions about the Projects must be submitted in writing via Online Portal Final Completion : July 1 , 2027

Post-Bid

$4,170,729.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
77
Bidding Soon
1,231
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2026

December 14, 2026

Project location map

3150 State Office Bldg, Salt Lake City, UT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed