BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 25, 2026 at 8:00 PM

Updated September 30, 2026

Site work for an educational facility in Tomball, Texas. Completed plans call for site work for a educational facility.

The Owner plans for Improvements to the Tomball HS Athletic Complex including site lighting upgrades to the football field, baseball and softball fields and the tennis courts. New padding and back tensioned backstop netting at the baseball and softball fields, including removing the existing padding and net system. Proposed bleacher system with pre-engineered press box, sidewalks to address accessibility, restroom additions to accommodate the increase in total occupancy. Tennis courts are recoated. The Project may include the following general scope items: 1. Site utilities, Concrete paving 2. Athletic Bleachers 3. Metal fabrications 4. Synthetic Turf Installation and Replacement 5. Tennis Court re-stripe/Resurface 6. Overhead coiling doors 7. Electrical 8. Sports LED lighting protection and emergency power Questions concerning the RFP Owner's Program Manager Contact Person is: Victor Fleming, CCM Program Manager Lockwood Andrews & Newnam, Inc. FOR: Tomball Independent School District 1110 Baker Dr. Tomball, TX 77375 Email: vcfleming@lan-inc.com Questions concerning the Contract Documents Architect's Contact Person is: Daniel Wagner - Vice President DIG Engineers 11 Greenway Plaza Houston, TX 77046 Email: daniel.wagner@digengineers.com Friday, September 18, 2026 @ 2:00 p.m. local time - Deadline for written requests for clarifications to the RFP or Construction Documents.

Post-Bid

$1,800,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
456
Active Projects
246
Bidding Soon
3,696
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2026

November 23, 2026

Project location map

30330 Quinn Rd, Tomball, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.