Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 28, 2026 at 8:00 PM

Updated October 4, 2026

Site work, paving and new construction of a clubhouse / community center in Sheridan, Wyoming. Completed plans call for the construction of a clubhouse / community center.

The Project consists of site and exterior building improvements for The Hub on Smith, 211 Smith Street, Sheridan , Wyoming. Work generally includes demolition of existing pavement, sidewalks, curbs, stairs, ramps, retaining walls, railings, equipment enclosures, landscaping, utilities, and selected exterior wall materials; construction of new concrete parking lots, access drives, sidewalks, curb and gutter, accessible parking areas, raised crosswalks, equipment pads, stairs, and related site features;grading, storm drainage, water, sanitary sewer, grease interceptor, electrical , sitelighting, landscaping, irrigation, signage, and pavement-marking improvements; and phased construction necessary to maintain access and facility operations . Exterior building work includes removal and replacement of selected brick veneer, metal siding, insulation, weather barriers , flashing, and trim; foundation-wall waterproofing and drainage-mat installation; removal and reinstallation of storefront windows, coping, artwork, signage, and interior window finishes; repairs and insulation at existing wall and floor framing; and construction of concrete mechanical pads with an aluminum screen wall and gates. 1 . Alternate No 1. includes the installation of a new permanent, whole service electrical generator. Bonds: Bid Bond required (unspecified amount). Question Deadline 10/19/2026 Online portal. Substantial Completion of the Work is to be completed as follows. Phase 1 - June 2, 2027. Phase 2 - August 25, 2027. Phase 3 October 27, 2027. Final completion is to be reached within 30 days of Substantial Completion.

GC Bidding

$1,400,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
7
Bidding Soon
114
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2026

December 28, 2026

Project location map

211 Smith St, Sheridan, WY

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed