Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 26, 2026 at 8:00 PM

Updated October 31, 2026

Site work for a transportation facility in Philadelphia, Pennsylvania. Completed plans call for site work for a transportation facility.

The Work includes but is not limited to: installation, integration, coordination, testing, and commissioning of 40th Street Substation just south-east of the trolley portal to support the dc traction power system serving the five Subway Surface Trolley Lines and construct new manholes and underground duct banks that will provide 630 V dc traction power feeder connections between the existing Market Street #4 and Woodland Avenue #22 substations. Question Deadline 10/01/2026 at 12:00 PM ET All questions must be submitted via email to dbrown@septa.org. Please be sure to reference the sealed bid # and project name in the subject line of your RFI emails. The contract duration is 863 calendar days from the notice to proceed. SEPTA retains the right to reject any and all bids, as determined to be in the best interest of SEPTA. SEPTA PURCHASE ORDER No. S-972814 Document Numbe 40TH -SPEC-4022025- ENG-001

Sub-Bidding

$300,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,038
Active Projects
389
Bidding Soon
5,917
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2026

January 4, 2027

Project location map

S 40th St, Philadelphia, PA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed