Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 9, 2026 at 8:00 PM

Updated October 15, 2026

Site work, paving and new construction of a road / highway in Martinsburg, West Virginia. Completed plans call for the construction of a road / highway.

Fine grading, installation of drainage structures, paving 1,800 linear feet of access road including rail crossing and truck turn around. Realignment and widening of 1,300 linear feet of U.S. 11, new access road construction, and utility relocation of 800 linear feet of 12-inch water line, 1,250 linear feet of 30-inch water line, and 210 linear feet of 8-inch sewer line. The Project includes the following Work: Priority 1 expectation is to fine grade, install additional drainage structures, and pave approximately 1,800 linear feet of existing gravel access road to CMC Steel this fall before asphalt plants close. This section also includes a rail crossing and truck turn around area. Priority 2 will be the realignment and widening of approximately 1,300 linear feet of U.S. 11 - Williamsport Pike to relocate the existing entrance, add turn lanes to U.S. 11 , and a construct approximately 600 linear of new access road and a new intersection to the new CMC Steel plant. The new entrance location will require utility relocations of 800 linear feet of 12- inch and 1,250 linear feet of 30-inch ductile iron water line and 210 linear feet of 8-inch SDR-35 sewer line in the road area Question Deadline Monday October12, 2026

GC Bidding

$6,000,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
538
Active Projects
203
Bidding Soon
3,369
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2026

December 21, 2026

Project location map

To Be Determined, Martinsburg, WV

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed