Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 30, 2026 at 8:00 PM

Updated October 15, 2026

Site work and paving for a mixed-use development in Alma, New Brunswick. Completed plans call for paving for a sidewalk / parking lot; and for site work for a playground / park / athletic field.

Reconstruction of the Alma Beach parking lot at Fundy National Park. Complete reconstruction of the Alma Beach parking lot including removal of existing asphalt pavement, curbs and sidewalks; excavation; geotextile and geogrid installation; granular subbase and base; hot mix asphalt paving; storm sewer piping and catch basin replacement; concrete curbs and sidewalks; rip rap; topsoil; hydraulic seeding; erosion and sediment control; restoration; traffic control; mobilization and demobilization. Documents can be found at https://canadabuys.canada.ca/en/tender-opportunities/tender-notice/cb-300-73651941

Post-Bid

$500,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
47
Bidding Soon
648
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2026

November 23, 2026

Project location map

8616 Main St, Alma, NB

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed