Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published October 2, 2026 at 8:00 PM
Updated October 5, 2026
Demolition, site work, new construction and renovation of an educational facility in Brooklyn Park, Minnesota. Completed plans call for the demolition of a educational facility; for the renovation of a 6,600-square-foot, one-story above grade educational facility; and for the construction of a educational facility.
Project Scope: The Project consists of an Interior remodel of an existing instruction plastics lab into a modern instructional robotics lab and classroom . The Project includes approximately 6,600 gross square feet located on the first floor at Hennepin Technical College's Brooklyn Park Campus. The work will include, but is not limited to: Minor demolition work includes selective demolition of partial walls, a paint booth and supporting ductwork, cooling, and sprinkler piping, replacement of an existing sink with a multi-station wash fountain, as well as light fixture relocation, cabling removal, panel and device removal . Minor construction work includes partial walls and a 'lid' to create a larger sound isolated instructional classroom space with acoustically treated walls and ceiling, interior doors, interior windows, frames, hardware, wire mesh partitions, and finishes. HVAC support for the classroom, infill of an existing trench drain, sprinkler piping modifications and additions, and electrical power, lighting, and device layout modifications to support the revised layout and function of the lab and classroom spaces. Refer to the construction drawings for full extents of demolition, relocation, and new work. The Work covers construction and completion of the Project as shown on the Drawings and as specified in the Project Manual. Prime Contractor under a direct contract with the Owner will complete all Work. D. Overall coordination of the Project will be the responsibility of the Prime Contractor. E. The Owner will occupy the adjacent existing facilities and be conducting regular programs during the entire time of the Project. The Contractor shall take all necessary precautions to maintain the existing Owner's activities and cooperate with the Owner in all construction Work to minimize conflict with Owner program requirements. Inspect and discuss condition of construction to be selectively demolished. Review structural load limitations of existing structure. Review and finalize selective demolition schedule and verify availability of demolition personnel, equipment, and facilities needed to make progress and avoid delays. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations. Review areas where existing construction is to remain and requires protection. 6. Review and finalize protection requirements. 5698 7. Review procedures for noise control and dust control. 8. Review storage, protection , and accounting for items to be removed for salvage or reinstallation
GC Bidding
$3,000,000.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 15, 2026
December 14, 2026
9000 Brooklyn Blvd, Brooklyn Park, MN
Related To This Project
Brooklyn Park, MN
Bid Date: Oct 15 2026
Brooklyn Park, MN
Bid Date: Oct 14 2026
Brooklyn Park, MN
Bid Date: Oct 15 2026
Brooklyn Park, MN
Bid Date: Oct 13 2026
Brooklyn Park, MN
Bid Date: Oct 01 2026
Brooklyn Park, MN
Bid Date: Sep 03 2026
Brooklyn Park, MN
Bid Date: Sep 03 2026
Brooklyn Park, MN
Bid Date: Sep 10 2026
Brooklyn Park, MN
Bid Date: Sep 10 2026
Brooklyn Park, MN
Bid Date: Aug 11 2026
Brooklyn Park, MN
Bid Date: Aug 13 2026
Brooklyn Park, MN
--
Brooklyn Park, MN
--
Brooklyn Park, MN
Bid Date: Oct 13 2026
Brooklyn Park, MN
Bid Date: Aug 06 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed
