Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 30, 2026 at 8:00 PM

Updated October 2, 2026

Demolition and renovation of an educational facility in Marion, Illinois. Completed plans call for the demolition of a educational facility; and for the renovation of a educational facility.

Removal of existing heating hot water boilers, injection pumps, base mounted pumps, expansion tanks, air separator, and associated piping. Installation of new high efficiency heating hot water boilers, injection pumps, base mounted pumps with VFDs, expansion tanks, air/dirt separator, flue and combustion piping, and related piping and electrical.

Sub-Bidding

$500,000.00

Public - City

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
59
Bidding Soon
1,042
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed