Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 6, 2026 at 8:00 PM

Updated October 12, 2026

Demolition, site work, new construction and renovation of a civil project in Ely, Minnesota. Completed plans call for the renovation of a water / sewer project; and water / sewer project.

Question Deadline 10/16/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing. Questions received less than ten (10) days prior to the date for opening of Bids may not be answered. The Work shall be completed under one Contract and consists of all labor, skill and materials required to properly construct the Project. The major elements of work associated with the project include, but are not limited to: Demolition of an existing 400 gpm self-priming centrifugal pump, process pipe, fittings, valves, and appurtenances located within the existing pump station ; o Installation of a new intake structure and intake screen with a capacity of up to 2,000 gpm and located within Burntside Lake ; o Installation of a new 16- inch , DR11 , HDPE gravity transmission pipeline from the new intake screen to the existing pump station located on shore (approximate length of 525 lineal feet) ; o Installation of various buried site ductile iron pipe, fittings, valves, and appurtenances to connect the new intake pipe to the pump station process piping;o Installation of various ductile iron process pipe, fittings, valves, and appurtenances inside of the existing pump station to connect the new pump to the suction and discharge piping;o Installation of a new vacuum prime assisted self-priming centrifugal raw water pump with a rated capacity of 1,000 gpm including a new variable frequency drive and a new simplex air compressor for the vacuum assist system ; o Various electrical improvements to provide power to the new raw water pump and appurtenances; o Various structural improvements to accommodate installation of the new pump and appurtenances including converting an existing exterior single door to a new double door as well as concrete equipment pads for the new equipment; ando Related site work, site grading , rip rap at the shoreline, seeding, and restoration work. Demolition of existing pump station components; installation of a new intake structure, screen, and 16-inch HDPE gravity transmission pipeline; installation of buried ductile iron piping, valves, and appurtenances; pump station piping modifications; installation of new vacuum prime assisted self-priming centrifugal raw water pump with VFD and air compressor; electrical and structural building improvements including equipment pads; site work, grading, and shoreline restoration.

GC Bidding

$3,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
11
Bidding Soon
126
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2026

December 28, 2026

Project location map

Burntside Lake, Ely, MN

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed