Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 1, 2026 at 8:00 PM

Updated October 4, 2026

Demolition, site work and renovation of a water / sewer project in Village of Wellington, Florida. Completed plans call for the renovation of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.

Question Deadline 10/19/2026 All questions about the meaning or intent of the Contract Documents are to be directed, in writing, to the Owner, attention to the Purchasing Department, as provided in the Advertisement/Invitation to Bid (unless another issuing office is designated in the Advertisement/Invitation to Bid). Questions received less than 10 days prior to the date set for the opening of bids may not be answered. Any and all questions regarding this solicitation shall be directed to the Wellington Purchasing Division: Attn Maria Miserendino, 12300 Forest Hill Boulevard, Wellington, Florida 33414: Ph 561-791-4154 or email mmiserendino@wellingtonfl.gov. The principal features of the Work to be performed under this Contract shall include but not limited to the following 1. Relocation of the Biosolids Control Room from the ground-floor electrical room to convert the upstairs locker-room to a new Control Room including the following: a. Relocate newly built-in existing lab furniture from the electrical room currently also used as a control room to the new control room, and finish areas where furniture will be removed in the electrical room. b. Demolish the shower, remove lockers and install a kitchenette with features shown on the drawings in the new control room c. Replace existing water heater and wall air conditioning unit as shown on the drawings. d. Install plumbing, electrical outlets and internet cabling as shown on the drawings. e. Perform structural work to the roof and existing observation window as shown on the drawings. Relocation of the Biosolids Control Room including construction of a new control room, installation of a kitchenette, replacement of a water heater and wall air conditioning unit, installation of plumbing, electrical, and internet cabling, and structural work to the roof and observation window.

GC Bidding

$500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
302
Active Projects
124
Bidding Soon
1,850
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2026

November 30, 2026

Project location map

11860 Pierson Rd, Village of Wellington, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed