Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 19, 2026 at 8:00 PM

Updated October 24, 2026

Site work for a water / sewer project in Demopolis, Alabama. Completed plans call for site work for a water / sewer project.

The project consists of installation of approximately 28,100 feet of 12-inch HDPE by open-cut, jack and bore, and horizontal directional drill methods. The Owner requires the Project to be Substantially Completed within 180 calendar days after the date when the Contract Time commences to run and complete and ready for final payment within 210 calendar days after the date when the Contract Time commences to run. Project Time shall be based upon the following milestone date: A minimum of 30% of the project's value DBE/MBE Participation:2.5% ; WBE Participation: 3.0% Commodities (Supplies) MBE 4% WBE 11% Contractual (Services)MBE 8% WBE 30% Equipment MBE 5% WBE 20% Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Mr. Casey Hellums, P.E., at casey.hellums@3notch.com. Questions received less than five (5) calendar days days prior to the date for opening of Bids may not be answered. Clearing and Grubbing, NPDES Permit, Erosion Control, and Reestablishment of Vegetation: Includes all labor, materials, equipment, purchase, transport, loading/unloading, installation, maintenance and removal of the erosion and sediment control plan/devices, and re-establishment of disturbed vegetation. The Owner has obtained the NPDES permit application. The permit application will be transferred to the Contractor and the Contractor shall provide inspections and shall be responsible for implementation and continuation of Best Management Practices Plan (BMPP) until permanent vegetation is established upon the entire project and ADEM has approved termination of the NPDES permit. Also includes all equipment, material, and labor associated with clearing and grubbing, removal of vegetation and spoils from site, mulching, dewatering, backfill, construction fencing, topsoil, cleanup and all related items required for a complete job. Payment shall be lump sum. Installation of Sewer Force Main and Casing by Open Cut, Insertion into Casing, Jack and Bore, or HDD: Includes all materials, equipment, tools, and labor required to completely furnish and install piping including, but not limited to, trench excavation, rock excavation (if required), compaction, pipe bedding, dewatering, pipe installation, backfill, piping, tracer wire, pipeline markers, fittings, inserting into casing, spacers and end seals, jacking, thrust walls , concrete thrust blocks, drilling, reaming, pit excavation, casing pipe, drilling fluid, transition fittings, longitudinal anchors, joint restraints, water, dewatering, slurry removal and disposal, clean-up, grassing, testing, disinfection, rock boring (if required), removal and replacement of small miscellaneous structures interfering with construction, and all related items. Payment shall be Lump Sum. - Installation of Casing by HDD - Railroad Crossing: Includes all materials, equipment, tools, and labor required to completely furnish and install piping including, but not limited to, rock excavation (if required), compaction, pipe bedding, dewatering, pipe installation, backfill, piping, tracer wire, pipeline markers, fittings, inserting into casing, spacers and synthetic rubber end seals with stainless steel connections, concrete thrust blocks, drilling, reaming, pit excavation, casing pipe, drilling fluid, transition fittings, longitudinal anchors, joint restraints, water, dewatering, slurry removal and disposal, clean-up, grassing, testing, disinfection, rock boring (if required), removal and replacement of small miscellaneous structures interfering with construction, and all related items . Includes all coordination with Norfolk Southern, flagging expenses, and all items required by the Norfolk Southern permit. Payment shall be Lump Sum. Manual Blow-Off Valve: Includes all labor, material, and equipment associated with excavation (including rock excavation), meter box, manual blow-off valve assembly, connection to main, internal piping, fill as indicated in the Plans, compaction, cleanup and restoration, testing, and all related items for a complete job. Payment shall be per each.

Post-Bid

$3,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
46
Bidding Soon
677
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2026

December 21, 2026

Project location map

Multiple Locations, Demopolis, AL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed