Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 14, 2026 at 8:00 PM

Updated October 20, 2026

Site work and renovation of a municipal facility in Okeechobee, Florida. Completed plans call for the renovation of a municipal facility.

Removal of existing shingles and installation of new thirty-year Timberline Architectural roof shingles, aluminum drip edge, leak barriers, deck protection, ridge vents, ridge caps, flashing, and pipe collars at the Brighton Reservation. The Scope of Work (SOW) contained in the Attachments as Attachment A Scope of Work describes the services expected for CONTRACTOR to provide the TRIBE. BIDDER must ensure all such services contained in Attachment A are provided for in every particular and shall meet or exceed the level of quality, availability, features, functionality, frequency, accuracy, and performance. The silence of specifications or requirements as to any detail contained in this document or any of the Attachments, or the apparent omission from any specifications or requirements , or a detailed description concerning any point, shall be regarded as meaning that only the best commercial practices shall prevail and that only material and workmanship of the finest quality are to be used. All interpretations of the SOW shall be made on the basis of this statement. ROOF REPLACEMENT: Remove existing shingles and responsibly dispose. Inspect all sheathing for possible damage. If damage is found, CONTRACTOR must stop work until contact is made with the TRIBE's Project Manager to receive direction. Pictures of damaged area must be taken. Install aluminum drip edge along all edges, eaves, and rakes per residential building code. Install leak barrier(s) at all eaves, valleys, and around penetrations. Install deck protection over remaining wood decking. Install thirty (30) year Timberline Architectural roof shingles (Color to be determined) using one and a quarter inch ( 1 1/4 ") hot dipped coil nails penetrating at nail zone. Replace all flashing that can be accessed without damaging siding materials, including counter, step, and apron flashing with new color coated aluminum. Step flashing must be four inches (4"). Any flashing fastened to masonry must be cut into masonry. Seal all exposed nail heads and transitions. Install and seal pipe collars. Install color matching ridge vent. Install ridge cap shingles over all hips and ridges using two-inch (2") nails Bonds: Bid Bond required (unspecified amount).

Sub-Bidding

$470,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
343
Active Projects
130
Bidding Soon
1,931
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2026

December 2, 2026

Project location map

19755 Reservation Rd NE, Okeechobee, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed