Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 13, 2026 at 7:00 PM

Updated November 19, 2026

Demolition and renovation of a multi-residential development in Okeechobee, Florida. Completed plans call for the renovation of a multi-residential development; and for the demolition of a multi-residential development.

IAQ repair services including mold remediation, duct cleaning, sanitizing, and replacement of bathroom and kitchen components such as cabinets, fixtures, and finishes. The Housing Department of the Seminole Tribe of Florida is requesting bids from qualified contractors to provide IAQ repair services needed at Brighton Reservation. Question Deadline 11/24/2026 at 5:00 PM ET Questions submitted through online Official bid documents must be obtained from https://www.bidnetdirect.com/private/solicitations/10091442158/abstract Set up containment area to isolate location(s) with six (6) Mil plastic and establish Negative Air in workspace. Set up qty. one (1) air scrubber for the entire duration of demolition services. Wipe down all surfaces with detergent solution and warm water. Complete duct cleaning and sanitizing prior to installing new materials. 1.2. BATHROOM: Set up containment barrier around work area. Seal HVAC registers and openings. Provide PPE, warning signs and restricted access. Provide HEPA air scrubbers inside and outside containment at 4-6 air changes per hour and dehumidification before and during remediation. Maintain humidity below 50% where possible and continue air filtration through clearance. 1.2.1. Remove and responsibly dispose of the following: o All shower wall and floor tile, backer board, setting materials, pan/liner, waterproofing and curb as required for complete replacement, inspect all adjacent drywall for mold. Upon removal of shower wall, inspect all adjacent walls for any microbial damage. Owner would like to retain existing T&G wood that is adjacent to the shower wall if possible. All bathroom flooring materials. All damaged base and non-restorable contaminated materials. 1.2.2. Remove the following and set aside for re-installation by CONTRACTOR: Vanity, countertop, sink, faucet and toilet. All ceiling fixtures, plumbing and electrical fixtures and trim, accessories and reusable shower enclosure components affected by the work. Clean exposed framing by sanding, scraping, wire brushing, peroxide-type cleaner and/or encapsulation as recommended in the IAQ report. HEPA vacuum and antimicrobial-wipe all restorable surfaces and contents within containment. Correct moisture sources and dry affected materials before rebuilding. Clean and sanitize HVAC system per NADCA standards. Fog HVAC unit and home with an antimicrobial/enzyme solution per the IAQ report and product labeling. Replace HVAC filter. Request clearance test from the TRIBE's Housing Department prior to any material put back. Coordinate clearance with Eco Mold Testing. Replace air-scrubber filters before testing, set scrubbers to neutral air and operate at least 24 hours before testing and through successful clearance Remove, responsibly dispose of, and replace the following with new, products to be supplied and installed by CONTRACTOR: All drywall, base and insulation that was removed by CONTRACTOR. Complete bathroom floor with tile , shower wall and floor tile assemblies, including backer, pan, drain connection, waterproofing, setting materials, grout and sealant. Wet areas shall be moisture resistant drywall. Shower areas shall receive appropriate tile backer and waterproofing. Test shower pan before tile installation. Use KILZ stain blocker on all stains and Finish, prime, and paint all areas within the project SOW with like-for-like colors using Sherwin Williams brand paint

GC Bidding

$600,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
366
Active Projects
133
Bidding Soon
1,964
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2026

January 17, 2027

Project location map

12610 Bird Nest Rd, Okeechobee, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed