Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 12, 2026 at 8:00 PM

Updated October 26, 2026

Site work for a water / sewer project in West Valley City, Utah. Completed plans call for site work for a water / sewer project.

Question Deadline 10/14/2026 at 5:00 PM MT Online Questions shall be submitted through Bonfire Online All questions regarding this RFSQ must be directed to the Project Manager, Zak Bedard, through the state's e-procurement platform, U3P, by the date and time identified above. Statements of qualifications for engineering design and CM/GC preconstruction services for replacement of the West Lake Wastewater Pump Station, relocated east of Bangerter Highway for the UDOT overpass. Design professional selection. Do not submit a fee. The Granger-Hunter Improvement District (District) is planning the 26M: West Lake Wastewater Pump Station Replacement Project. The existing West Lake Wastewater Pump Station (West Lake WWPS) is located near 2700 South and 3800 West, adjacent to Bangerter Highway in West Valley City, Utah. The Utah Department of Transportation (UDOT) needs the pump station relocated across Bangerter Highway to the east side to accommodate construction of a new overpass. The proposed replacement site is generally at the southeast corner of Bangerter Highway. The planned pumping capacity is approximately 212 gallons per minute (GPM) average flow and 276 GPM maximum flow

Post-Bid

$1,000,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
73
Bidding Soon
1,219
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2026

June 21, 2027

Project location map

To Be Determined, West Valley City, UT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed