Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 9, 2026 at 8:00 PM

Updated October 15, 2026

Demolition, site work, paving, new construction and renovation of a mixed-use development in Keystone, South Dakota. Completed plans call for the demolition of a playground / park / athletic field; for the construction of a playground / park / athletic field; for the renovation of a 774-square-foot, one-story above grade playground / park / athletic field; and one-story above grade playground / park / athletic field.

Grizzly Bear Campground reconstruction project. Scope includes road alignment adjustments and surfacing, pumphouse demolition and new construction, water system replacement including storage tank, hydrants, and treatment building, campsites redesign for accessibility, installation of new double toilet building, host site improvements including wastewater connections and tank, electrical service upgrades, and signage installation. Bonds: Bid Bond required (unspecified amount), Performance Bond required (unspecified amount), Payment Bond required (unspecified amount). Project Magnitude between $ 1,000,000 and $ 5,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions shall be submitted via email to paula.sales@usda.gov and pps.proposals@usda.gov and are due no later than October 29, 2026, at 12:00 PM Mountain Time. This project is located at the Grizzly Bear Campground, off US Highway 16A, approximately 2 miles southwest of Keystone, Pennington County, South Dakota. For reference, Grizzly CG is located approximately 1 mile southeast of Mount Rushmore National Memorial.

GC Bidding

$5,000,000.00

Public - Federal

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
10
Bidding Soon
137
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2026

November 30, 2026

Project location map

US-16A, Keystone, SD

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed