Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 14, 2026 at 8:00 PM

Updated October 17, 2026

Demolition and site work for a municipal facility in East Pittsburgh, Pennsylvania. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.

Compliance is required with the Davis-Bacon Act and other Federal Labor Standard Provisions; Title VI and other applicable provisions of the Civil Rights Act of 1964 ; the Department of Labor Equal Opportunity Clause (41 CFR 60 1.4); Section 109 of the Housing and Community Development Act of 1974 ; Executive Order 11625 (Utilization of Minority Business Enterprise); Executive Order 12138 (Utilization of Female Business Enterprise) ; in compliance with Section 504 of the Rehabilitation Act of 1973 and the Americans with Disabilities Act of 1990; the Allegheny County MBE/WBE Program enacted July, 1981, which sets forth goals of 13 percent Minority and 2 percent Female Business Enterprise; and the Allegheny County Ordinance # 6867-12, setting forth goals of 5 percent Veteran -Owned Small Businesses. Each bid must be accompanied by a Bid Bond or Certified Check payable to the Turtle Creek Valley Council of Governments in an amount of not less than ten percent (10%) of the Base Bid . No bidder may withdraw his or her bid within sixty (60) days after the actual bid opening thereof The TCVCOG reserves the right to reject any or all bids, alternates or parts of bids. Technical questions pertinent to the work to be performed under this Contract may be addressed to: Robert E. Zischkau, Jr. Glenn Engineering & Associates, Ltd. 14920 Route 30, North Huntingdon, PA 15642 Phone: 412-667-0218 Fax: 412-824-9587 Email: bobz@glennengr.com The Lump Sum Price in the Proposal Form shall include the cost of demolition and disposal of each of the structures contained in the following list including, but not limited, to the following work: All site preparation work in terms of acquisition of required permits and utility clearances. The termination and disconnection of all utilities. Removal of any foundation walls to a depth of two feet below ground level. B Removing wood, metal, or other building debris. After review by the Engineer, backfilling with clean soil or slag to ground level as required by the municipality's grading ordinance. Removal and disposal of all pillars, steps, sidewalks, trees, tree trunks, shrubs, and other such facilities. 0 Backfill of the site with suitable material, including proper compaction. _ Seeding of the demolition site in order to prevent erosion and provide revegetation, including placement of not less than ten inches (10") of suitable topsoil

Sub-Bidding

$10,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
336
Active Projects
177
Bidding Soon
2,189
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2026

November 26, 2026

Project location map

137 Parkway Ave, East Pittsburgh, PA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed