Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 19, 2026 at 7:00 PM

Updated November 23, 2026

Site work and paving for a mixed-use development in York, Nebraska. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

**As of November 19th, 2026, the project was awarded to Van Kirk Brothers with an awarded amount of $1,596,031.15 ** This project consists of constructing approximately 5,000 SY of 9" P.C. paving including integral curb and gutter for the improvement north of W. 25th Street. This project also consists of 4,400 LF of 10" DIP water main, 2,500 LF of 10" PVC sanitary sewer and 500 LF of storm sewer and associated structures and all other associated work as indicated on the drawings and within the specifications. Bonds: Bid Bond required (unspecified amount), Certified Check required. Question Deadline 10/20/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Jacob Reiter: email jreiter@olsson.com or ph. 308.708.7650 Questions received less than seven days prior to the date for opening of Bids may not be answered.

Award

$1,596,031.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
40
Bidding Soon
668
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2026

January 1, 2027

Project location map

W 25th St, York, NE

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed