Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 3, 2026 at 7:00 PM

Updated November 11, 2026

Site work and paving for a sidewalk / parking lot in Bloomfield, Missouri. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The construction of ADA compliant sidewalk along Willow Drive and installation of RRFB at Route J school crossing to improve safety and connectivity for pedestrian traffic near the New Bloomfield Elementary and High Schools. The prime contractor must be on MoDOTs approved contractor listing. This requirement includes that the contractor has submitted to MoDOT a Contractor Questionnaire and/or Contractor Prequalification Questionnaire with attachments not later than seven (7) days prior to the date and hour of the bid opening (see Section 102.2 of the Missouri Standard Specifications for Highway Construction for more details). The prime contractor must perform, with its own organization, work amount to not less than 30% of the total original contract price. The right is reserved to reject any or all bids by the Owner with MODOT concurrence. MODOT - New Bloomfield R-III School District All questions concerning the bid document preparation can be directed to the New Bloomfield R-III School District Superintendent at (573) 491-3700. Project specific questions can be directed to Michael Harrington, PE, RSP1 at (573) 875-8799.

Post-Bid

$2,000,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
38
Bidding Soon
586
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2026

March 29, 2027

Project location map

Willow Drive & Route J, Bloomfield, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed