Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 13, 2026 at 8:00 PM

Updated October 29, 2026

Demolition, site work, asbestos abatement and new construction of a municipal facility in Seaboard, North Carolina. Completed plans call for the demolition of a municipal facility; for asbestos abatement for a municipal facility; and for the construction of a municipal facility.

SEABOARD 2021 CDBG-NR PROJECT Demolition and clearance of one house, removal of asbestos, and the provision and installation of one State Building Code modular house. The Town expects demolition and clearance work to be completed within 45 days from the Notice to Proceed. Evidence of insurance is due before the start of any work. The Town intends to select the one firm for the demolition, based on the lowest responsible proposal. The Town of Seaboard will enter into contract for the work. The Town of Seaboard is an equal opportunity employer and service provider. Small , minority, and/or women owned, Historically Underutilized Business (HUB), and Section 3 (low income) businesses and labor surplus area firms are encouraged to submit BIDS. The Fair Housing Act prohibits discrimination in housing based on race, color, national origin, religion, sex, family status, and disability. The Town of Seaboard reserves the right to waive any informalities or to reject any and all bids. Completely demolish the house structure from the property to include all concrete footings. Remove concrete sidewalk and concrete steps at end of sidewalk at front of house. Remove exterior light post and wood mailbox post. Remove all debris/garbage, small vegetation and small trees around the exterior of house. Completely remove large tree at left side of house and concrete blocks from around the tree. Completely remove large tree at rear of house behind the rear deck, including several small trees around it. Remove small tree, brick/block and concrete steps by tree at right side of house near drive area. Remove two tree stumps at both left and right corners of the house. All trees removed to include removal of tree stumps below ground level and any roots above or around the ground. The Town has received $235,939 in a federal 2021 CDBG-NR grant representing 100% of total project costs If you have any questions, call me at 252-521-3229 (cell).

Post-Bid

$235,939.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
308
Active Projects
121
Bidding Soon
2,293
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2026

November 25, 2026

Project location map

603 Washington St, Seaboard, NC

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed