Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 13, 2026 at 8:00 PM

Updated October 19, 2026

Demolition, site work, paving, new construction and renovation of a mixed-use development in Keene, New Hampshire. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for the renovation of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; and road / highway.

Engineering services for the Transportation Heritage Trail Phase 2 project, including engineering study, preliminary engineering, final design, permitting, right-of-way acquisition, and bid assistance. Scope includes upgrading 1,500 ft of existing rail corridor (drainage, grading, paving), bridge relocation and rehabilitation (abutments, wing walls, concrete decks, site grading, railings), and trailhead creation at Joslin Station Road.

Conceptual

$750,000.00

Public - City

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
720
Active Projects
331
Bidding Soon
4,852
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed