Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 16, 2026 at 8:00 PM

Updated October 22, 2026

Renovation of a water / sewer project in Hancock, Michigan. Completed plans call for the renovation of a water / sewer project.

Evaluation of the Hancock Creek Dam. Questions that arise because of this RFP MUST BE SUBMITTED IN WRITING to the issuing office no later than Wednesday, October 7, 2026, at 2:00 p.m., Eastern time (ET). If it becomes necessary to amend any part of this RFP, addenda will be posted on the SIGMA VSS website PROJECT DESCRIPTION/SERVICES REQUESTED Hancock Creek Dam (dam id #88) in Dickinson County was constructed in 1951 to control wildlife flooding, originally created by a beaver dam. The dam is owned and operated by DNR Wildlife Division. The dam consists of a 338-foot-long earth embankment with a structural height of 12 feet. The principal spillway is a concrete drop box with a single 7-foot wide stoplog section . The spillway has a total weir length of 21 feet. The concrete inlet structure is founded on eight-gauge steel sheet pilings . The inlet structure is connected to a 40-foot long, 60-inch diameter corrugated metal pipe (CMP) outlet pipe. A plank walkway with a pipe handrail provides access to the stoplogs. The current condition of the dam is fair, but several recommendations from an EGLE Safety inspection in 2024 included filling depressions and animal burrows on upstream slope and monitoring a crack for growth on the principal spillway concrete component. In November of 2025, the band connecting the 60-inch CMP failed, resulting in a separation of the inlet pipe. An emergency drawdown was conducted to protect the dam from failure. A snowmobile trail crosses the dam and is managed by PRD. The road is also a forest road and is managed by FRD. Provide Phase 100 professional services to evaluate the current condition of Hancock Creek Dam and the associated embankment. Include developed construction estimates for significant repairs to the current structure and/or a complete replacement of the dam (2 options ). Following this project evaluation, the next phase will include securing all necessary permits, completed and approved section 106 documentation and tribal consultation, final design drawings, T/E plan clearance and approval, and a complete bid packet forconstruction when funds are acquired. Note that funding was originally allocated for emergency repairs, and the Agency is now moving forward with a Phase 100 evaluation to determine extent and cost for repairs

Post-Bid

$500,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2026

February 15, 2027

Project location map

To Be Determined, Hancock, MI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed