Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 13, 2026 at 8:00 PM

Updated October 19, 2026

Demolition, site work and addition to a transportation facility in Edwards AFB, California. Completed plans call for the addition of a 22,500-square-foot transportation facility; for the demolition of a transportation facility; and for site work for a transportation facility.

The project generally consists of construction of a new two-story addition to Hangar B1210, including associated architectural, structural, civil, mechanical, plumbing, electrical, fire protection, fire alarm, communications, low voltage, site improvements, and related work. The solicitation also includes an option for demolition of the existing modular structures within Hangar B1210. The Base Bid period of performance is 550 calendar days, with any awarded option work to be completed within the same overall period. Requests for Information (RFIs) will be accepted at any time during the proposal preparation period; however, if a RFI is received after COB 14 Oct 2026, there is no guarantee of an answer being provided. RFIs submitted before 14 Oct 2026 will receive a response from the Government no later than 23 Oct 2026. RFI Q&As will be summarized and provided to all potential offeror

GC Bidding

$15,000,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
482
Active Projects
184
Bidding Soon
3,677
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2026

December 28, 2026

Project location map

305 Popson Ave, Edwards AFB, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed