Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 15, 2026 at 8:00 PM
Updated October 21, 2026
Site work for a water / sewer project in Peachtree City, Georgia. Completed plans call for site work for a water / sewer project.
Structural concrete repairs to the Lake McIntosh Dam spillway structure. Lake McIntosh Dam Spillway Structural Repairs 1. Travel to Lake McIntosh Dam and coordinate access and work activities with Fayette County Water System (FCWS). 2. Provide all labor, supervision, materials, equipment, access equipment, protection, cleanup, and incidentals necessary to complete the work described in this Scope of Work and the referenced repair specifications. 3. Review the Arcadis Structural Evaluation Report, crack mapping figures, and Attachment A - Lake McIntosh Dam Spillway Structure Photograph Log before beginning work. The crack maps and photographs shall be used to identify and locate the repair areas. 4. Prepare and repair non-structural cracks greater than 0.01 inches in width on the north and south spillway walls in accordance with the non-structural crack and leakage repair system specified in the Repair Specifications. 5. Repair leakage locations associated with construction joints, form ties, formwork joints, and other documented leakage paths on the north and south wall interior faces and labyrinth weir wall . Refer to Photographs 28 through 37 and the crack mapping figures for representative locations. 6. Repair diagonal cracks identified as potential shear cracks on the north and south spillway walls using the structural crack repair system specified in the Repair Specifications. The contractor shall repair all observed diagonal shear-type cracks identified in the Arcadis assessment and associated photograph log, including the closely spaced diagonal cracking in the sloped wall areas. 7. Repair cracks that overlap or propagate from formwork tie holes. These areas shall be properly prepared and patched in accordance with the Repair Specifications. 8. Repair concrete surface deterioration, including minor spalling, voids, bug holes, and exposed aggregate, where identified in the assessment and photograph log. Representative conditions are shown in Photographs 24 through 27. 9. Repair and patch concrete at the wall-to-slab joint areas where minor spalling or unsound concrete is present, using the specified concrete repair mortar system. 10. Cracks less than 0.01 inches in width that are identified by the Arcadis assessment as monitor-only conditions shall not be repaired unless directed by FCWS. The contractor shall document such conditions encountered during the work and notify FCWS of any crack that appears to have changed materially from the documented condition. 11. Because portions of the exterior wall were inaccessible during the Arcadis assessment due to backfill material , the contractor shall notify FCWS if additional access, excavation, or other work is determined to be necessary to complete a repair. No excavation or removal of backfill shall be performed without prior written authorization from FCWS. 12. Protect existing structures, pedestrian bridge components, drain outlets, gates, piping, coatings, and other site features from damage during the work. 13. Perform surface preparation in accordance with applicable NACE, ICRI , and ACI guidelines and the repair product manufacturer's written instructions. 14. Install all repair materials in strict accordance with the manufacturer's written installation requirements, including substrate preparation, mixing, placement, curing, temperature limitations, and required dry or wet conditions. 15. Provide product data sheets, technical data, safety data sheets, installation procedures, and any other requested submittals for FCWS approval before installation of repair materials. 16. Inspect completed repairs with FCWS and address any deficient, incompletely bonded, improperly finished, or otherwise unacceptable work at no additional cost to FCWS. 17. Remove all construction debris and excess materials from the spillway structure and surrounding work area. Leave the site clean and suitable for return to service. 18. Provide photographic documentation of completed repairs, including representative before-and-after photographs and identification of repaired locations. 19. Coordinate completion of the work so that the spillway structure can be returned to service in accordance with FCWS direction. REPAIR SPECIFICATIONS - The repair systems, materials, and performance requirements listed below are based on Section 4 of the Arcadis Lake McIntosh and Lake Kedron Dam Spillway Walls Structural Assessment dated October 27, 2023. These requirements may be provided as Attachment B - Structural Repair Specifications with the RFQ. Where a product is identified, an approved equal may be proposed for FCWS approval Non-Structural Crack and Leakage Repair System o Hydrophobic polyurethane chemical grout forming a flexible gasket. Acceptable products include SikaFix HH LV by Sika Chemical Company, Hydro Active Flex SLV by De Neef Construction Chemicals, Inc., or approved equal. o Hydrophobic polyurethane shall have a shrinkage limit not exceeding 4.0 percent in accordance with ASTM D1042, minimum elongation of 250 percent in accordance with ASTM D3574, and minimum tensile strength of 150 psi in accordance with ASTM D3574. o Hydrophilic acrylate-ester resin forming a flexible gasket and increasing in volume by at least 50 percent when in contact with water. Acceptable product includes Duroseal Multigel 850 by BBZ USA, Inc., or approved equal. Structural Crack Repair System o Epoxy injection shall be a low-viscosity, high-modulus, moisture-insensitive type. o Acceptable products include Sikadur 35, Hi-Mod L.V. and Sikadur 31, Hi-Mod Gel by Sika Corporation; Eucopoxy Injection Resin by Euclid Chemical Company; or approved equal. Surface Deterioration Repair o Provide a prepackaged, cement-based repair mortar specifically formulated for repairing concrete surface defects. o Acceptable products include SikaTop 122 Plus, SikaTop 123 Plus, SikaTop 126 Plus by Sika Corporation; DuralTop Gel or DuralTop Flowable Mortar by Euclid Chemical Company; or approved equal. o Repair mortar shall be a two-component, polymer- modified Portland cement, fastsetting, trowel-grade mortar enhanced with a penetrating corrosion inhibitor. o Minimum one-day compressive strength : 2,000 psi in accordance with ASTM C109. o Minimum 28-day compressive strength: 6,000 psi in accordance with ASTM C109. o Minimum 28-day bond strength: 1,800 psi in accordance with ASTM C882, modified for use with repair mortars. o Where the least dimension of the placement in width or thickness exceeds four inches, extend repair mortar by adding aggregate as recommended by the repair mortar manufacturer. Question Deadline 11/09/2026 at 3:00 PM ET Questions concerning this Invitation to Bid should be addressed to Colette Cobb, Contract Administrator, in writing via email to ccobb@fayettecountyga.gov.
GC Bidding
$500,000.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 19, 2026
December 21, 2026
3501 Tdk Blvd, Peachtree City, GA
Related To This Project
Peachtree City, GA
Bid Date: Nov 17 2026
Peachtree City, GA
--
Peachtree City, GA
--
Peachtree City, GA
Bid Date: Oct 15 2026
Peachtree City, GA
Bid Date: Sep 17 2026
Peachtree City, GA
Bid Date: Sep 17 2026
Peachtree City, GA
Bid Date: Sep 10 2026
Peachtree City, GA
Bid Date: Sep 16 2026
Peachtree City, GA
--
Peachtree City, GA
Bid Date: Aug 12 2026
Peachtree City, GA
Bid Date: Jul 14 2026
Peachtree City, GA
Bid Date: Jun 05 2026
Peachtree City, GA
Bid Date: Jun 11 2026
Peachtree City, GA
--
Peachtree City, GA
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed