Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 5, 2026 at 7:00 PM
Updated November 11, 2026
Demolition for an educational facility in Salina, Oklahoma. Completed plans call for the demolition of a educational facility.
Demolition of the existing old elementary school facility. Bonds: 5% Bid Bond. Scope of work to include complete demolition and disposal of existing old elementary to the extent shown on Attachment A Site Map. All costs associated with site security, demolition, utility disconnection and permanent disconnection. Construction Manager for this project is Trigon, Inc. You may contact at projects@trigoninc.com or (918) 252-7162. The Scope of Work shall include, but is not necessarily limited to the following general items: All submittals, shop drawings, samples and mock-ups required by the contract documents. Furnish all licenses and permits and arrange for inspections and required testing as may be required by and for this contractor's work. Protection of adjacent surfaces and repair of any damage caused by the work of the contractor. Contractor to provide manpower and equipment necessary, as required by the project schedule, and to provide additional crews, equipment, etc and/or overtime required to maintain the schedule if contractor falls behind due to their own fault or due to inclement weather. Project is proposed to start upon approval of the project costs by the Owner. Contractor to provide for its employees all necessary safety railing and fall protection as required by authorities having jurisdiction. Contractor to be responsible for field engineering, layout and field layout from benchmarks and base building control furnished by the construction manager. Include all comebacks / remobilization operations relating to this work which is normal or is to be expected. Receiving, hoisting and materials transport for this scope of work. Temporary barricades, flagmen and traffic control as required. Pumping and dewatering as required for this scope of work. Saw cutting and patching, as required for completion of the work required by this scope of work. Provide drinking water for your employee's and your subcontractors employee's under this scope of work. Provide all shoring, bracing, scaffolding, work platforms, equipment and supplies to complete all work performed in this contract. Coordinate material deliveries with construction manager and provide employee to receive deliveries. Prepare in an acceptable format, and submit to construction manager, a job specific safety plan including written hazard analysis. Contractor shall perform daily clean up his work in such a manner as to maintain safe working conditions on the project, including but not limited to excess material , lunch trash and dirt and debris on streets and sidewalks. All trash generated from this contractors work or forces shall be removed by contractors own forces and equipment for placement in on-site dumpster provided by the demolition contractor. Waste that requires special disposal such as concrete, pavement or hazardous waste will be disposed of by contractor and not placed in on- site dumpster. If after 24 hours notice contractor fails to clean-up trash, then Construction Manager may clean up and the cost thereof shall be charged to the contractor. Assist the owner's materials testing laboratory in obtaining samples and gathering data as needed. Laboratory materials testing shall be provided by others, however, any re-testing required due to failed initial testing due to the action of this contractor shall be paid by this contractor. Contractor shall attend weekly project coordination meetings while performing work on the site. Contractor will be expected to sign the form of agreement, and provide insurance as required in the project specification, insurance certificate shall be provided prior to starting work on-site. Coordinate location of existing utilities with the owner and construction manager.
Post-Bid
$100,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 3, 2026
December 3, 2026
707 N Cherokee St, Salina, OK
Related To This Project
Salina, OK
Bid Date: Nov 10 2026
Salina, OK
Bid Date: Oct 20 2026
Salina, OK
Bid Date: Jul 23 2026
Salina, OK
Bid Date: Aug 12 2026
Salina, OK
Bid Date: Jun 10 2026
Salina, OK
Bid Date: Mar 05 2026
Salina, OK
Bid Date: Dec 17 2025
Salina, OK
Bid Date: Sep 25 2025
Salina, OK
Bid Date: Sep 10 2025
Salina, OK
Bid Date: Sep 03 2025
Salina, OK
Bid Date: Dec 18 2025
Salina, OK
Bid Date: Mar 06 2026
Salina, OK
Bid Date: Aug 06 2025
Salina, OK
Bid Date: Jul 23 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed