Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 15, 2026 at 8:00 PM

Updated October 20, 2026

Demolition, site work and environmental remediation for a manufacturing facility in Erving, Massachusetts. Completed plans call for the demolition of a manufacturing facility; for environmental remediation for a manufacturing facility; and for site work for a manufacturing facility.

The deadline to ask questions regarding this procurement has been changed from September 29, 2026, at 2:00PM to Friday, October 23, 2026, at 5:00PM . Questions are to be submitted in the manner described in the procurement document. All inquiries should be made via e-mail at bids@erving-ma.gov and directed to: Bryan Smith, Town Administrator The approximately 43.26-acre parcel has approximately 6 acres of developable land with quick access to Massachusetts Route 2 and Route 63. The developable portion of the property is zoned Central Village and is serviced by public water and sewer. The site is located along the Millers River and is a short distance from residential areas with a newly renovated park and the downtown of the Village of Millers Falls. Current assessment has the property valued at $ 1,411,800 (land / building). The Town intends to subdivide the parcel to retain ownership of the undevelopable portion of the parcel for riverbank protection. There are eight (8) main buildings on the property, many of which are divided into several sub-buildings identified in the feasibility study. The buildings' conditions range from extremely poor to fair. The suitability of each building for rehabilitation is left to the discretion of the Proposer The Millers Falls International Paper (IP) Mill was built in 1902 in Erving, Massachusetts along the banks of the Millers River. Site Details Currently owned by the Town of Erving 43.26 acres of land total/ project area is approximately 6.0 acres Serviced by municipal water & sewer Project area zoning is Central Village (CV) District and is included in the proposed Planned Unit Development Overlay District. The remainder of the parcel is in the Rural Residential District Close proximity to Route 2 , Route 63 and Interstate 91 Can be serviced by cable broadband Eligible for New Market Tax Credits Eligible for Economic Development Incentive Program (EDIP) Structure Tax Agreements (STA) Located in a PACE Community

GC Bidding

$1,411,800.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
893
Active Projects
391
Bidding Soon
5,902
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2026

January 11, 2027

Project location map

8 Papermill Rd, Erving, MA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed