Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 4, 2026 at 7:00 PM

Updated November 19, 2026

Site work and new construction of a water / sewer project in Williamson, Georgia. Completed plans call for the construction of a water / sewer project.

Construction of a filter backwash water treatment facility consisting of concrete structures, yard piping, gravel and sand filter media, a dichlorination system, and erosion control measures. Bonds: 10% Bid Bond, Certified Check required, 100% Performance Bond, 100% Payment Bond. The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed Filter Backwash Water Treatment as shown on the construction drawings. In general, construction consists of concrete structures, yard piping, gravel & sand filter media, dichlorination system, erosion control and all associated measures for a complete project. Time allotted for completion of work is 60 consecutive calendar days to substantial completion. Work shall be complete and ready for contract close-out with 74 consecutive calendar days. All work shall be completed in accordance with the plans and specifications. The work will be awarded in one (1) Contract. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered.

Post-Bid

$100,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
339
Active Projects
153
Bidding Soon
2,516
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2026

December 14, 2026

Project location map

Midway Rd, Williamson, GA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed