Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 10, 2026 at 7:00 PM
Updated November 12, 2026
Demolition, site work and renovation of a clubhouse / community center in Stanton, California. Completed plans call for the demolition of a clubhouse / community center; for the renovation of a clubhouse / community center; and for site work for a clubhouse / community center.
Interior renovations including cabinet upgrades, installation of handrails, corner guards, crash rails, door thresholds, ADA improvements, and painting. This Project comprises of the furnishing of all materials, equipment, tools, labor and incidentals as required by the Plans , Specifications, and Contract Documents. The general items of work to be performed hereunder consist of but not be limited to Permitting, Mobilization; Preparation and Implementation of Best Management Practices; Demolition and preparation as required for the base scope of work; interior painting; renovation of existing cabinetry, including new cabinet doors and hardware, refinishing of existing cabinet boxes, and installation of new countertops; installation of new stainless steel handrails; installation of new aluminum corner guards and crash rails along the Banquet Hall walls; installation of new thresholds at existing doors; ADA enhancements; and all incidental and associated work necessary to complete the base scope of work to complete this Project in its entirety. The Contractor shall perform all work in a neat and workmanlike manner, with consideration given to the intended use and public-facing nature of the facility. All finishes, repairs, transitions, and installations shall provide a uniform, durable, and professional appearance suitable for a public assembly and event facility. Completed work shall be free of visible defects, damage, irregularities, and unfinished conditions and shall be subject to acceptance by the City Question Deadline 11/02/2026 at 2:00 PM Questions regarding the Contract Documents, requests for interpretations or clarifications, either administrative or technical, may be directed to the Engineering Assistant, Daniel Herrera, by email at DHerrera@StantonCA.gov. The scope of work includes, but is not limited to the following: General contractor to be responsible for all demolition in preparation for new work. Remodel of existing Stanton Community Center Banquet Hall Interior improvements to include new stain on existing concrete flooring and new stair treads for stairs in the hallway. New paint on walls, stage trim, window frames, and doors/door frames. Renovate existing cabinetry for compliance and provide new countertops and plastic laminate on doors. Remove and replace necessary portions of banquet hall flooring. Provide new stainless-steel handrails and rubber stair tread on stage stairs, new crash rails on banquet hall walls, and new thresholds at existing double doors. There is no building expansion/addition of existing floor area in this project
GC Bidding
$450,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 16, 2026
December 16, 2026
7800 Katella Ave, Stanton, CA
Related To This Project
Stanton, CA
--
Stanton, CA
Bid Date: Nov 03 2026
Stanton, CA
Bid Date: Oct 21 2026
Stanton, CA
--
Stanton, CA
Bid Date: Sep 09 2026
Stanton, CA
Bid Date: Sep 22 2026
Stanton, CA
Bid Date: Sep 21 2026
Stanton, CA
Bid Date: Sep 15 2026
Stanton, CA
Bid Date: Aug 18 2026
Stanton, CA
Bid Date: Aug 18 2026
Stanton, CA
--
Stanton, CA
Bid Date: Jun 23 2026
Stanton, CA
Bid Date: Apr 08 2026
Stanton, CA
Bid Date: Mar 25 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed