Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 19, 2026 at 8:00 PM
Updated October 24, 2026
Site work and renovation of a water / sewer project in Key West Nas, Florida. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Rehabilitation of Pump Station R. For information regarding this project, contact: AXEL RIVERA 550 W CYPRESS CREEK RD FORT LAUDERDALE, FL 3309 The City wants bids from qualified contractors to furnish all labor, materials and equipment to rehabilitate sewage Pump Station "R". The station is a wastewater lift station with a submersible wet well plus valve and flowmeter vaults. The work produces a complete, working station along with record drawings, surveys and incidental work Clarification Submittal Deadline: October 30, 2026, 3:00 P.M. LOCAL TIME Any request for information concerning this project must be made in writing, , to Lucas Torres-Bull, Procurement Manager, at lucas.torresbull@cityofkeywest-fl.gov. Site work: demolition of the existing site, temporary bypass pumping so the station stays in service during construction, concrete site work and equipment pads, asphalt and sod restoration, and new 7 ft wood fencing with swing and slide gates. Yard piping: new yard piping and utilities, a new force main connection and a pump-out connection. Station rehabilitation: selective demolition inside the wet well and vaults two new submersible pumps rated at 1,590 GPM at 22 ft TDH, with new piping, valves and accessories new access hatches and miscellaneous metals aluminum handrails and an equipment platform new concrete top slabs for the wet well and vaults coating of the wet well and vault concrete concrete repairs, bid at 10 SY unit price Odor control: a new odor control unit with 10" odorous-air piping from the wet well. Electrical: full site and station electrical, including a new pump control panel (CP-R- 1) with soft starters, running on 480V 3 -phase power receptacle site lighting Instrumentation and controls: new I& C in the wet well and vaults, communicating with the City's SCADA by radio. The City's controls vendor (DFS) supplies a telemetry unit that goes into the control panel, and the contractor has to coordinate that handoff and the station downtime. Any work from the drawings/specifications that pertain to the scope of work of the project. an automatic transfer switch electrical work for the generator and generator platform, including a 400A, 600V generator Work Included: The design and furnishing of all materials, equipment and labor for the construction/implementation of Pump Station R Rehabilitation and all necessary appurtenances and Record Drawings, surveys, and incidental work to provide a complete and serviceable project identified as: PUMP STATION R REHABILITATION Related requirements in other parts of the Contract Documents: General and Supplementary Conditions of the Contract for Construction. Contractor's Duties: In addition to provisions stipulated in other portions of the Contract Documents, the Contractor shall secure permits as necessary for proper execution and completion of the work. The Contractor shall be totally responsible for all permits required and shall ensure that construction complies with all applicable local, state, and federal codes. The Contractor shall provide an experienced, qualified, and competent Superintendent to oversee the Work and perform quality assurance inspections . Prior to starting construction, the proposed Superintendent's qualifications shall be submitted in writing to the City for approval. The approved Superintendent shall be expected to remain for the duration of the Project, unless the City or Engineer deem him/her inadequate and requests his/her removal or the Contractor cannot continue his services to the Project for a reason or reasons that shall be communicated in writing to the City. A replacement Superintendent shall be required to follow the same approval process as required for the original. The Superintendent shall provide to the City Inspector Construction Reports for each day of construction, the reports shall be in English, legible, and signed. Contractor shall provide PDF copies monthly. Reports shall include quantity control checks done daily. It shall be the Contractor's responsibility to request approval for entrance to the site for work on Saturdays, Sundays, holiday, and weekday hours other than 7:00 a.m. until 7:00 p.m. No construction can commence before 8:00 a.m. on weekdays. The Contractor shall provide material safety data sheets (two copies) for chemicals, paints, coatings and materials used onsite prior to initiation of work.
GC Bidding
$500,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 16, 2026
December 16, 2026
To Be Determined, Key West Nas, FL
Related To This Project
Key West Nas, FL
Bid Date: Dec 02 2026
Key West Nas, FL
Bid Date: Jul 19 2019
Key West Nas, FL
Bid Date: Nov 23 2026
Key West Nas, FL
Bid Date: Nov 24 2026
Key West Nas, FL
Bid Date: Nov 18 2026
Key West Nas, FL
Bid Date: Nov 05 2026
Key West Nas, FL
Bid Date: Nov 02 2026
Key West Nas, FL
Bid Date: Nov 23 2026
Key West Nas, FL
--
Key West Nas, FL
Bid Date: Oct 15 2026
Key West Nas, FL
Bid Date: Oct 27 2026
Key West Nas, FL
Bid Date: Nov 09 2026
Key West Nas, FL
Bid Date: Oct 16 2026
Key West Nas, FL
Bid Date: Oct 23 2026
Key West Nas, FL
Bid Date: Oct 13 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed