Updated October 26, 2026

Demolition, site work and renovation of a water / sewer project in Key West Nas, Florida. Completed plans call for the renovation of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.

The project consists of full wood dock replacement and additional decking replacement within the Key West Bight Marina. Work will include the replacement of pilings, horizontal and diagonal cross-members, bents and stringers, and decking all installed with stainless steel hardware, as well as all utilities and accessories for ADock; and decking replacement with stainless steel hardware for D-Dock; all as described in the Scope of Work. Work Included: The design and furnishing of all materials, equipment and labor for the construction of ITB #26-021 A-Dock Replacement and D-Dock Decking Replacement - Key west Bight Marina and all necessary appurtenances and record drawings, surveys, and incidental work to provide a complete and serviceable project per the Contract Documents and Drawings as follows: The project consists of demolition, replacement, and construction associated with the existing marina dock system, including structural, decking, utility, and electrical improvements, together with all labor, materials, equipment, permits, testing, and incidentals necessary for a complete and operational installation as shown in the supplemental information attached with this document. The project also includes, but is not limited to, the following: A-Dock: o o o o o o o o o o o o o Removal and disposal of all designated existing timber pilings to be pulled from their existing locations. Removal and disposal of all existing timber connection members including pile caps, crossbracing, stringers/joists, and decking. Removal and disposal of all hardware associated with wood removal. Furnish and install new timber marine structural components, including piles, pile caps/saddles, cross-bracing, stringers, blocking, and decking. New piles are to be installed in existing pile sockets of removed piles. As existing piles are removed, the locations/sockets must be maintained and documented, or new pile installation must follow immediately, to ensure pile installation occurs within the same socket/footprint in accordance with the FDEP and USACE permits All connections / hardware shall be heavy duty for marine environment conditions, 316 stainless steel. All wood piles embedded 5 ' minimum into caprock. Pile cut-off elevation shall be based on surrounding piles +/- 2-3 inches. Treat cut surfaces in accordance with AWPA M4. Treat field cuts, holes, and other pile penetrations with field applied wood preservative, in accordance with AWPA M4. Deviation from and angle of batter: 1/4 inch per foot of pile length, but no greater that 6 inches. Maximum deviation from location of pile top is 6 inches. Furnish and install electrical distribution equipment, dock pedestals, conduit, conductors, pull boxes, grounding/bonding, and all required hardware. Furnish and install potable water, sanitary sewer pump-out, and fire utility systems including all required piping, fittings, valves, supports, connections, and appurtenances shown or required for a complete installation. Include all support hardware, hangers, anchors, sleeves, penetrations, and corrosion-resistant fasteners required for marine conditions. Furnishing and installing dock accessories, including cleats, bumpers, line hangers, ladders, and any associated mounting hardware or support components shown or required. o Obtain & pay for all City permits required for the project. o Comply with all conditions of the ACOE & FDEP permits. All piles to be southern yellow pine, Wolmanized CCA treated marine grade, 2.50pcf in accordance with AWPA UC5C marine pile. All piles to conform with ASTM D 25, be unused, clean peeled, uniformly tapered, one piece from butt to tip. All wood members shall be marine lumber CCA treated, 2.50pcf and 06.0 pcf (per Design Plans), in accordance with AWPA UC5C and UC4B. D-Dock: Removal and disposal of existing composite deck boards and all hardware and/or fasteners associated with the removal. Furnishing and installation of IPE premium grade deck decks, predrill to receive stainless steel fasteners. Temporary removal and reinstallation of all pedestals, transformers, sewer pumpouts, fire hose cabinets , hose bibs, cleats, ladders, etc. required to allow for new decking installation Appurtenances removed shall be reinstalled with new 316 stainless steel hardware. Question Deadline 10/30/2026 at 3:00 PM ET Questions from potential and/or actual respondents regarding this ITB shall be directed in writing by email, to the Procurement Contact email address Keith Bring, Project Manager (305) 809-3866 Keith. Bring@cityofkeywest-fl.gov

GC Bidding

$500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
6
Bidding Soon
66
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 23, 2026

December 16, 2026

Project location map

To Be Determined, Key West Nas, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed