Site work for a playground / park / athletic field in Etowah, Arkansas. Completed plans call for site work for a playground / park / athletic field.

Park Improvements To Include Extension Of Walking Trail, Repair Of Existing Walking Trail And Other Improvements 1.1It is intended that the contract shall include all materials , labor, equipment, services, etc. required for the Construction of a PARK IMPROVEMENTS TO INCLUDE EXTENSION OF WALKING TRAIL , REPAIR OF EXISTING WALKING TRAIL AND OTHER IMPROVEMENTS in Etowah Arkansas , together with any site work and attendant facilities thereto, as shown in the Drawings and described in the Specifications prepared by Miller Newell Engineers, 510 Third Street, Newport , AR . The Contractor will not be required to perform work that is not within the general character and scope of the Drawings and Specifications or not reasonably inferrable therefrom; however, he must recognize and accept the fact that these documents are not intended to illustrate or describe each and every possible detail of construction or finish that will be encountered in the execution of the work, nor can they show the exact location of each mechanical line, wiring device, fixture, etc. Where conditions are encountered that have not been specifically shown or detailed , they shall be worked out and finished similar to other details of like nature, or in accordance with supplementary Drawings furnished by the Engineer. It shall be the responsibility of the General Contractor to coordinate all of the various phases of the construction and finish materials, including mechanical and electrical lines and equipment, so that all of the many components will fit together and function properly without interference one to the other to the end that the entire job when completed will present a neat and finished appearance with all movable parts and mechanical and electrical equipment operating properly, ready for the Owner's occupancy and use . PART 2. SCOPE OF SUBCONTRACTORS WORK 2.1 This shall be established by agreement between the General Contractor and his subcontractors . For convenience of reference , the Specifications are separated into titled sections ; however, such separation shall not operate to make the Engineer and arbiter to establish limits of the contracts between the General Contractor and subcontractors . The Owner reserves the right to waive any informalities or to reject any or all bids. Each bidder must deposit with his bid security in the amount, form and subject to the conditions provided in the Information for Bidders. Each bid must be accompanied by a Bid Bond payable to the Owner for five percent of the total amount of the bid. As soon as the bid prices have been compared, the Owner will return the bonds of all except the three lowest responsible bidders. When the Agreement is executed, the bonds of the two remaining unsuccessful bidders will be returned. The Bid Bond of the successful bidder will be retained until the Payment Bond and Performance Bond have been executed and approved, after which it will be returned. A certified check may be used in lieu of a Bid Bond. A Performance Bond and Payment Bond, each in the amount of 100 percent of the contract price, with a corporate surety approved by the Owner, will be required for the faithful performance of the contract.

GC Bidding

$1,500,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
60
Bidding Soon
834
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2026

January 11, 2027

Project location map

To Be Determined, Etowah, AR

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed