Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 16, 2026 at 8:00 PM
Updated October 18, 2026
Site work for a playground / park / athletic field in Etowah, Arkansas. Completed plans call for site work for a playground / park / athletic field.
Park Improvements To Include Extension Of Walking Trail, Repair Of Existing Walking Trail And Other Improvements 1.1It is intended that the contract shall include all materials , labor, equipment, services, etc. required for the Construction of a PARK IMPROVEMENTS TO INCLUDE EXTENSION OF WALKING TRAIL , REPAIR OF EXISTING WALKING TRAIL AND OTHER IMPROVEMENTS in Etowah Arkansas , together with any site work and attendant facilities thereto, as shown in the Drawings and described in the Specifications prepared by Miller Newell Engineers, 510 Third Street, Newport , AR . The Contractor will not be required to perform work that is not within the general character and scope of the Drawings and Specifications or not reasonably inferrable therefrom; however, he must recognize and accept the fact that these documents are not intended to illustrate or describe each and every possible detail of construction or finish that will be encountered in the execution of the work, nor can they show the exact location of each mechanical line, wiring device, fixture, etc. Where conditions are encountered that have not been specifically shown or detailed , they shall be worked out and finished similar to other details of like nature, or in accordance with supplementary Drawings furnished by the Engineer. It shall be the responsibility of the General Contractor to coordinate all of the various phases of the construction and finish materials, including mechanical and electrical lines and equipment, so that all of the many components will fit together and function properly without interference one to the other to the end that the entire job when completed will present a neat and finished appearance with all movable parts and mechanical and electrical equipment operating properly, ready for the Owner's occupancy and use . PART 2. SCOPE OF SUBCONTRACTORS WORK 2.1 This shall be established by agreement between the General Contractor and his subcontractors . For convenience of reference , the Specifications are separated into titled sections ; however, such separation shall not operate to make the Engineer and arbiter to establish limits of the contracts between the General Contractor and subcontractors . The Owner reserves the right to waive any informalities or to reject any or all bids. Each bidder must deposit with his bid security in the amount, form and subject to the conditions provided in the Information for Bidders. Each bid must be accompanied by a Bid Bond payable to the Owner for five percent of the total amount of the bid. As soon as the bid prices have been compared, the Owner will return the bonds of all except the three lowest responsible bidders. When the Agreement is executed, the bonds of the two remaining unsuccessful bidders will be returned. The Bid Bond of the successful bidder will be retained until the Payment Bond and Performance Bond have been executed and approved, after which it will be returned. A certified check may be used in lieu of a Bid Bond. A Performance Bond and Payment Bond, each in the amount of 100 percent of the contract price, with a corporate surety approved by the Owner, will be required for the faithful performance of the contract.
GC Bidding
$1,500,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 10, 2026
January 11, 2027
To Be Determined, Etowah, AR
Related To This Project
Etowah, AR
Bid Date: Feb 10 2026
Etowah, AR
Bid Date: Nov 02 2023
Etowah, AR
Bid Date: Nov 02 2023
Etowah, AR
Bid Date: Jan 11 2023
Little Rock Air Force Base, AR
Bid Date: Nov 18 2026
Hope, AR
Bid Date: Nov 02 2026
Hickory Ridge, AR
Bid Date: Nov 04 2026
Jonesboro, AR
Bid Date: Nov 04 2026
Bentonville, AR
--
Clarksville, AR
Bid Date: Oct 23 2026
Little Rock, AR
Bid Date: Nov 03 2026
Wynne, AR
Bid Date: Oct 27 2026
Osceola, AR
Bid Date: Oct 29 2026
North Little Rock, AR
Bid Date: Nov 23 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed