Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 19, 2026 at 8:00 PM

Updated October 24, 2026

Site work and paving for a mixed-use development in Newton, Iowa. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The project consists of sidewalk improvements at multiple locations within the City of Newton Wastewater Pollution Control (WPC) Plant. Base bid work includes removal of existing sidewalks, grading and subgrade preparation, installation of new concrete sidewalks with modified subbase, minor valve box adjustments, erosion control, and restoration of disturbed areas. Additional improvements, including the 7-inch concrete driveway at the digester building bypass and other designated improvements, are included as bid alternates and are not part of the base bid unless accepted by the city. All work shall be completed in accordance with the project plans, the 2026 Iowa SUDAS Standard Specifications, City of Newton supplemental specifications, and applicable Iowa DOT standard specifications and details.

Sub-Bidding

$900,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
49
Bidding Soon
960
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2026

December 16, 2026

Project location map

Multiple Locations, Newton, IA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed