Site work and renovation of a power facility in Greenport, New York. Completed plans call for the renovation of a power facility; and for site work for a power facility.

Replacement of above-ground storage tanks at the village power plant. The work consists principally of removing and replacing an existing 8,000-gallon double-wall steel diesel AST (Tank # 19) and an existing 1,000-gallon double-wall steel waste-oil AST (Tank # 20) and installing a new 1,000 -gallon double-wall steel UL- 142 waste oil AST (Tank #41) manufactured by Containment Solutions and a new 8,000-gallon double-wall steel UL- 142 Diesel AST (Tank #42) manufactured by Containment Solutions (C- 110.01/ C-120.01) and install a new drum containment pallet and level float for the existing 55- gallon drum, and the existing OMNTEC OEL8000II to be replaced with new OMNTEC Proteus-X ATG together with existing reinforced concrete pad verification, defined repairs and tank anchorage as detailed , product piping, secondary containment piping, vents, valves, spill containment, tank instrumentation, automatic tank gauging, leak detection, high-level annunciation, pump control , electrical connection, and final testing/certification. New 1,000-gallon double-wall steel UL-142 Waste Oil AST (Tank #41) replacing existing AST (Tank #20) identified on C- 100.01/C-110.01. New 8,000-gallon double-wall steel UL- 142 Diesel AST (Tank #42), replacing existing AST (Tank #19) identified on C- 100.01/C-120.01. New Omntec Proteus-X ATG serving Tanks # 36 , # 37, # 41 , #42, and #43, including required programming, relay/interface hardware and migration and testing of retained Tank # 36/# 37 monitoring equipment. New 3/4-inch Schedule 40 carbon-steel waste-oil primary product piping with 4-inch SWFRP secondary containment piping for the outdoor transition. New 2-inch Schedule 40 carbon-steel diesel supply and return piping with 4-inch SWFRP secondary containment piping for the outdoor transition. Connection of new diesel supply/return piping to the existing permitted indoor emergency-generator product piping; existing indoor piping, day tanks and previously permitted generator equipment are to remain unless specifically shown otherwise. New tank-top equipment, valves, vents, gauges, spill containers, leak sensors, ATG equipment and related accessories. New waste-oil transfer-pump contactor/starter arrangement with the Omntec Proteus X ATG programmed automatic start/stop and Tank #41 high-level shutdown per D-200.01. New drum spill-containment pallet for a single 55-gallon drum (Tank #43) ; existing 660- gallon drum-storage area identified as Tank #38 remains

Sub-Bidding

$500,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
645
Active Projects
254
Bidding Soon
4,124
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 4, 2026

December 4, 2026

Project location map

400 Moores Ln, Greenport, NY

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed