Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 18, 2026 at 7:00 PM
Updated November 26, 2026
Demolition, site work and renovation of a playground / park / athletic field in La Grange, California. Completed plans call for the demolition of a playground / park / athletic field; and for the renovation of a playground / park / athletic field.
Removal, haul-off, and disposal of an existing dilapidated boat dock, and fabrication and installation of a new commercial-grade floating dock system measuring approximately 6 feet by 120 feet, including aluminum framing, decking, floats, cleats, and anchoring to existing piles and shore. Q&A Deadline 11/09/2026 5:00 PM (PST) Question, in written form , regarding this RFQ should be referred to: RFQ Point of Contact Stanislaus County 1010 10th Street, Ste. 5400 Attention: Jamie Smith General Services Agency / Purchasing Division Modesto, CA 95354-0859 E-mail: gsapurchasing@stancounty.com Stanislaus County Parks and Recreation (County Parks) is under contract with the State of California to operate and maintain the Turlock Lake State Recreation Area, located at 22600 Lake Road, La Grange, California 95329. In addition to its operation and maintenance responsibilities, County Parks has obtained a grant through the California Department of Parks and Recreation to rehabilitate and re-establish facilities and infrastructure at the recreation area. These efforts are intended to restore the park's facilities and infrastructure and support the eventual re-opening of Turlock Lake State Recreation Area for public use The existing dock located at the most westerly side of the boat launch ramp (refer to Exhibit C) is dilapidated and must be replaced. The selected Contractor shall furnish, fabricate, deliver, and install a new commercial-grade floating dock system consisting of six (6) sections, each approximately 6 feet wide by 20 feet long, for an assembled dock configuration of approximately 6 feet by 120 feet. The work shall include the complete removal, haul-off, and disposal of the existing dock. The replacement dock is anticipated to include, at a minimum, the following components and materials: 2" x 6" x 1/4" aluminum box-tube main frame. o o 2" x 3" x 1/4" aluminum box-tube cross members. 1-1/2" x 3" x 1/8" aluminum box-tube stringers. Piano hinges connecting dock sections. 16-inch-high encapsulated floats. Double composite walers around the perimeter of the dock. 8-inch hot-dip galvanized (HDG) steel cleats. . Four (4) vertical boarding/handhold rails. Two (2) HDPE-lined pile squares. Four (4) legs with HDPE pads per dock section. Composite wheel-stop edge boards along the dock surface. Aluminum non-slip decking designed for stationary or floating, open-air boat docks. Decking shall be vented to allow for wave dissipation. Anchoring to the existing piles and attachment to the existing concrete landing at shore. The existing piles are classified as "interior piles" and will be located within the interior footprint of the dock frame. Accordingly, the pile guides shall be designed and positioned to accommodate the existing piles while allowing the dock to move freely in the vertical direction in response to fluctuating water levels, without binding or restricting movement The existing piles are classified as "interior piles" and will be located within the interior footprint of the dock frame. Accordingly, the pile guides shall be designed and positioned to accommodate the existing piles while allowing the dock to move freely in the vertical direction in response to fluctuating water levels, without binding or restricting movement.
Post-Bid
$450,000.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 20, 2026
December 21, 2026
22600 Lake Rd, La Grange, CA
Related To This Project
La Grange, CA
Bid Date: Jul 14 2026
La Grange, CA
Bid Date: Dec 09 2025
La Grange, CA
Bid Date: May 17 2024
La Grange, CA
Bid Date: Mar 28 2024
La Grange, CA
Bid Date: Jan 26 2022
La Grange, CA
Bid Date: Jan 19 2022
La Grange, CA
Bid Date: Feb 10 2022
La Grange, CA
Bid Date: Mar 10 2023
La Grange, CA
Bid Date: Jun 01 2022
La Grange, CA
Bid Date: Mar 30 2022
La Grange, CA
Bid Date: Apr 14 2022
Madera, CA
Bid Date: Nov 20 2026
Corcoran, CA
Bid Date: Dec 17 2026
Los Angeles, CA
Bid Date: Nov 10 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed