Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 11, 2026 at 7:00 PM

Updated November 19, 2026

Site work for a mixed-use development in Fernandina Beach, Florida. Completed plans call for site work for a playground / park / athletic field.

Project no=E2605.01, 53758.003 Harmonization of the road right-of-way along Sadler Road and S. Fletcher Avenue, as well as Seaside Park area. Question Deadline 11/09/2026 SITE DESCRIPTION The Project Site encompasses the road right-of-way along Sadler Road and S. Fletcher Avenue, as well as Seaside Park. Currently, the area features a blend of residential and commercial development alongside coastal sand dunes and beach access points. The site has experienced little to no structural development changes over the past several decades. SCOPE OF WORK o o Demolition of approximately 24,842 square feet of existing asphalt pavement and crushed shell parking surface, associated curb, and sidewalk. Demolition of six pavilions totaling approximately 2,432 square feet and approximately 1,458 square feet of boardwalk. Demolition of landscaping, furnishings and signage. o Construction of six new pavilions totaling approximately 2,169 square feet o Construction of approximately 208 linear feet of 6' wide boardwalk o Construction of approximately 11,380 square feet of concrete parking drive aisle o Construction of approximately 9,967 square feet of paver parking area o o Construction of associated curb, gutter, sidewalk, curb ramps, wheel stops, and pavement striping Installation of approximately 783 square feet of sand-filled geocell gridstabilization CITY OF FERNANDINA BEACH ITB 27-02 BEACH HARMONIZATION - SEASIDE PARK Construction of one dry retention area Installation of approximately 749 LF of 24" exfiltration trench Installation of approximately 10 concrete drainage structures o Installation of two new outdoor showers and associated drainage o Installation of one monument sign Installation of various identity, information, education, and regulatory signs Installation of various hardscape elements and furnishings o Installation of landscaping o o Installation of an automatic irrigation system All other labor, material , equipment, and incidentals necessary to complete the work as shown in the Drawings. Alternate Add - Removal of the existing wooden decking and replacement with composite decking to match the new portion of the project, for approximately 285 linear feet of the existing wooden dune walkover from the beach to the tie-in at the new portion of the project. The existing dune walkover was reconstructed within the past few years.

GC Bidding

$1,100,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
62
Bidding Soon
1,023
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2026

January 29, 2027

Project location map

2002 S Fletcher Ave, Fernandina Beach, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed