Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 26, 2026 at 8:00 PM

Updated October 29, 2026

Demolition, site work, new construction and renovation of a mixed-use development in Plymouth, Wisconsin. Completed plans call for the expansion of a playground / park / athletic field and water / sewer project.

Spillway replacement and improvements at Plymouth Dam. Work includes construction dewatering, earth moving, cast-in-place and pre-cast concrete, steel sheet piling, installation of a hydraulically operated crest gate, piping, electrical work, pavement replacement, and landscaping. Bonds: 5% Bid Bond, 100% Performance Bond, 100% Payment Bond. In general, the project consists of spillway replacement and other improvements at the Plymouth Dam along the Mullet River in Plymouth, WI. Major project components include construction dewatering, earth moving, cast-in-place concrete, pre-cast concrete, steel sheet piling, a hydraulically operated crest gate, piping, electrical work, pavements, and other site improvements. Question Deadline 11/24/2026Contact Ethan Smith (SmithE@AyresAssociates.com) with questions . Requests for such interpretation shall be made to Ayres in writing. The work shall be performed in accordance with general sequence or phasing outlined below. Contractor shall be responsible of the specific sequence of work within this general outline. Installation of erosion control measures. Construction of a temporary bypass channel on the river right (west) side of the dam . Installation of construction dewatering measures on the river left (east) side of the dam. Construction of a cast-in -place concrete spillway and walls on the river left (east) side of the dam . Installation of a hydraulically controlled crest gate. Installation of pre-cast concrete walkway over the crest gate spillway. Removal of construction dewatering measures on the river left (east) side of the dam . Construction of new sheet pile and cast-in-place concrete walls on the river right (west) side of the dam . Placement of fill and riprap to achieve planned grades. Construction of a building to house the hydraulic power unit on the river left (east) side of dam . Pavement replacement and other site improvements. Turf replacement. 13. Site restoration.

GC Bidding

$2,700,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
69
Bidding Soon
1,518
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2026

February 1, 2027

Project location map

630 Eastern Ave, Plymouth, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed