Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 28, 2026 at 8:00 PM

Updated November 3, 2026

Site work and new construction of a water / sewer project in Collinsville, Oklahoma. Completed plans call for the construction of a water / sewer project.

Installation of approximately 11,850 linear feet of 24-inch PVC waterline and 1,170 linear feet of 16-inch PVC and HDPE waterline, including two double barrel cased horizontal directional drill creek crossings and related restoration work. Bonds: 5% Bid Bond, Certified Check required, 100% Performance Bond, 100% Payment Bond. The Contractor shall complete all Work as specified or indicated in the Contract Documents. The Project is generally described as follows: 1. Bridge 146 Saunders Creek Waterline Relocation ODOT Project 31177 (04) along North 4000 Road from West 3900 Road (Vera Road ) north approximately 800 linear feet: The project will include the provisions for all labor, equipment, materials ( i.e., materials not otherwise provided by the Owner), services and documentation required for the installation of approximately 858 linear feet of 6-inch waterline ( PVC and HDPE); one ( 1) bored and cased County road crossing; one (1 ) cased horizontal directional drill creek crossing; and two (2) long water service transfers. The Project Site includes property, easements, and designated work areas described in greater detail in the Contract Documents but generally located along the West side of North 4000 Road, north of the W 3900 Road (Vera Road) intersection in Vera, Oklahoma.

GC Bidding

$3,500,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
103
Bidding Soon
841
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2026

February 1, 2027

Project location map

Multiple Locations, Collinsville, OK

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed