Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 3, 2026 at 7:00 PM

Updated November 4, 2026

Demolition, site work, paving, asbestos abatement and new construction of a water / sewer project in Pittsburg, California. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for asbestos abatement for a water / sewer project.

Abandonment, removal, and decommissioning of existing water facilities including asbestos-cement water main and construction of new water transmission main. Scope includes installation of 1,680 linear feet of 12-inch PVC water main, butterfly valves, valve assemblies, anchor blocks, air release valve assembly, fire hydrant assembly, pipeline tie-ins, trench excavation, backfill, pavement and surface restoration, traffic control, and erosion/sediment control. Bonds: 10% Bid Bond, Certified Check required, 100% Performance Bond, 100% Payment Bond. Questions Due: Thursday, November 19, 2026, at 11:00 a.m. via email to SSaklaen@pittsburgca.gov and sreese@pittsburgca.gov The Project is located along Alta Vista Circle between Crestview Drive and Cabrillo Place in the City of Pittsburg and is generally described as follows: The work consists of abandoning, removing and decommissioning existing water facilities, including the existing asbestos-cement water main, and constructing a new water transmission main within the public right-of-way along Alta Vista Circle and at the Crestview Drive tie-in locations . The work includes installation of approximately 1,680 linear feet of 12-inch PVC water main (DR- 14, C900 ), butterfly valves, valve assemblies with anchor blocks, a combination air release valve assembly, a fire hydrant assembly, associated pipeline tie- ins and appurtenances, trench excavation and backfill, pavement and surface restoration, traffic control, erosion and sediment control , and all other work necessary to complete the Project in accordance with the Plans, Specifications, and Contract Documents. Along Crestview Drive, the Contractor shall perform the water main valve installation work in three (3) phases, with each planned water service interruption limited to eight (8) consecutive hours. Question Deadline 11/25/2026 Questions or requests for clarifications regarding the Project, the bid procedures, or any of the Contract Documents must be submitted in writing to SM Saklaen, Senior Civil Engineer at ssaklaen@pittsburgca.gov and Savon Reese, Associate Engineer at sreese@pittsburgca.gov .

GC Bidding

$1,500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
563
Active Projects
241
Bidding Soon
3,691
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2026

January 11, 2027

Project location map

Alta Vista Cir, Pittsburg, CA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed