Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 2, 2026 at 7:00 PM

Updated November 4, 2026

Demolition, site work and renovation of a fire / police facility in Raleigh, North Carolina. Completed plans call for the demolition of a fire / police facility; and for the renovation of a fire / police facility.

Question Deadline 11/12/2026 at 5:00 PM ET The scope of work associated with this project includes the removal/disposal of existing HVAC systems, installation of new HVAC systems, installation of new line sets and all inspection/permitting fees. All work is to be performed in accordance with current North Carolina code. location- Fire Station #1 - 220 S Dawson St, Raleigh, NC 27601 Fire Station #8 - 5001 Western Blvd, Raleigh, NC 27606 Fire Station #9 - 4465 Six Forks Rd, Raleigh, NC 27609 Fire Station #19 - 4209 Spring Forest Rd, Raleigh, NC 27616 Fire Station #23 - 8312 Pinecrest Road, Raleigh, NC 27613 Fire Station #28 - 3500 Forestville Rd , Raleigh, NC 27616 Fire Station #29 - 12117 Leesville Rd, Raleigh, NC 27613 Equipment Specifications Like for like replacement for all systems. Preferred brand is: (1 ) Goodman (2) Rheem or equally compatible. 15 seer unit or greater. New digital non-programmable thermostats. Air handler must be sized to handle up to a MERV 8 filter rating. New electric heat strips, where applicable. New disconnects must be fusible single throw type. Exterior disconnects must be rated for outdoor use, only if necessary to replace. Installation Specifications Remove and dispose of all old equipment and reclaim refrigerant in accordance with EPA (Environmental Protection Agency) regulations. Existing line sets may be reused but must be flushed. Provide and install liquid line refrigerant filter driers, if applicable. Existing condensate drainage may be used but must be in accordance with updated code regulations. Provide new drain pan with overflow safety cutout switch, where applicable. If secondary drain is not used, a secondary drain switch must be installed. Provide and install the necessary stands/mounts for new equipment to ensure transitions are aligned and service is easily accessible. Existing stands/mounts may be utilized if applicable to the new equipment. Contractor will include new duct alterations for transitions and connections from new equipment to existing supply and return duct, if necessary. Duct replacement throughout the facility is not a part of this project. Equipment duct connections must be sealed with foil mastic sealant tape or equivalent o Filter access must be easily accessible. Existing gas pipe may be utilized to connect to new equipment. Gas piping connected to the new equipment must be updated in accordance with current code regulations. The contractor is responsible for any leaks in the gas piping between the first shutoff valve and the unit gas valve. The City of Raleigh will be responsible for leaks between the first gas shut-off valve and the gas meter. Existing intake and exhaust flues can be used but must be updated in accordance with current code regulations. All electrical work in relation to the new equipment must be done by the contractor (ex. upsize wires, breaker(s), and disconnecting means to accommodate new equipment). New electrical wire and flex/conduit must be provided for all new outdoor equipment to disconnecting means. Thermostat / low voltage wire going to the outdoor equipment must be protected where it is exposed to the elements. Seal or re-seal all wall penetrations in relation to the new equipment installation. Wall penetrations must be sealed in accordance with North Carolina and NFPA (National Fire Protection Association) regulations. All line sets must be pressure tested and a triple vacuum performed before opening condenser. Weigh in proper refrigerant charge, start-up, and checkout of system operations. All work shall be performed in accordance with North Carolina code. Contractor is to provide and is responsible for all permitting and inspection(s). All work is to be done Monday through Friday 8:00 a.m. to 5:00 p.m.

Sub-Bidding

$500,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
293
Active Projects
140
Bidding Soon
2,149
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed