Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 18, 2026 at 7:00 PM

Updated November 24, 2026

Demolition and site work for an educational facility in Chadron, Nebraska. Completed plans call for the demolition of a educational facility; and for site work for a educational facility.

The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: 1 . Remove of Brooks Hall, capping and re-routing of utilities, fill and fine grading, capping of tunnel and installation hatch and ladder, and patching of adjacent sidewalks. Type of Contract: 1 . Project will be constructed under a single prime contract. Question Deadline 11/16/2026 at 5:00 PM MT Any pre -bid questions shall be directed to TSP Architecture as soon as possible

Post-Bid

$900,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
6
Bidding Soon
115
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2026

May 10, 2027

Project location map

245 E 10th St, Chadron, NE

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed