Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 5, 2026 at 7:00 PM

Updated November 11, 2026

Site work and new construction of a playground / park / athletic field in Youngstown, New York. Completed plans call for the construction of a one-story above grade playground / park / athletic field.

The purpose of this RFP is to obtain competitive proposals from qualified contractors to construct a new ADA-compliant, wood-framed restroom building with vinyl siding exterior at Falkner Park. Architectural drawings and technical specifications have been prepared by the Village's Architect/Engineer of Record and are made available to qualified proposers as part of the Contract Documents (File No. 25-086-C, dated November 3, 2025). The Village intends to award a single lump-sum or unit-price contract for all construction work shown in the Contract Documents. All site preparation, excavation, and earthwork Concrete footings and slab-on-grade foundation Wood-frame wall and roof construction with structural sheathing and weatherresistive barrier Vinyl siding, soffit, and exterior trim 60-mil TPO single-ply membrane roofing with R- 25 polyisocyanurate insulation FRP (Fiberglass-Reinforced Plastic) wall panels at all interior wet areas ADA-compliant hollow metal doors with remote access electronic locking system (LTE cellular) Porcelain floor tile and ceramic wall tile finishes Complete plumbing -- water service connection, sanitary sewer connection, water closets, urinals, lavatories, mop sink, frost-free hose bibbs, and water heater Complete electrical - 200-amp service, LED lighting, GFCI devices, exit/emergency lighting Electric wall unit heaters and exhaust ventilation in each restroom space ADA-accessible site improvements, concrete sidewalks, and lawn restoration o All work shown on Contract Documents File No. 25-086-C Q/A:- All questions and requests for clarification regarding this RFP or the Contract Documents shall be submitted exclusively in writing via email to the Village Clerk at Clerks Office@youngstownny.gov. The subject line of all question emails shall read exactly as follows: "QUESTIONS - FALKNER PARK RESTROOM BUILDING - FILE NO. 25-086-C." Questions must be received by the Village no later than November 30, 2026 at 4:00 PM Eastern Time. The Village anticipates issuing a written Notice to Proceed (NTP) by January 28, 2027 ; Final Completion shall be achieved within 6 months of the start date.

GC Bidding

$100,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
569
Active Projects
254
Bidding Soon
4,181
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2027

January 28, 2027

Project location map

Falkner Park, Youngstown, NY


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed