Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 19, 2026 at 7:00 PM

Updated November 24, 2026

Site work and new construction of a water / sewer project in Ocean City, Maryland. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Construction and installation of Primary Screening improvements, two new Sludge Holding Tanks, a Mechanical Dewatering System, Sludge Transfer Pumps, Sludge Mixing Blowers, and a new CMU Dewatering Building. Includes rehabilitation of existing Sludge Drying Beds and Greenhouses, construction of new Sludge Drying Beds and Greenhouses, yard piping, associated demolition, SCADA integration, and modification of an existing building into a Storage Building. Contractors having questions concerning the bid should submit them in writing via email to the Worcester County Procurement Officer, Edward Welch at eawelch@worcestermd.gov no later than noon on November 23, 2026. Questions shall include the project name (Mystic Harbour WWTP Biosolids Upgrade) in the subject heading. Bonds: 5% Bid Bond, 100% Performance Bond, 100% Payment Bond. Contract Duration: 450 Calendar Days The site of the proposed Mystic Harbour WWTP Biosolids Upgrade project is located behind the Greene Turtle Restaurant at 9616 Stephen Decatur Highway, Ocean City, Maryland 21842. B. Directions to the site are as follows: From US Route 50, turn South onto County Road 611 South in Ocean City, MD. Travel approximately 0.8 miles and take a left into the driveway of 9616 Stephen Decatur Highway, Ocean City, Maryland 21842. Follow the dirt road back until you enter WWTP The work under this Contract consists of constructing, complete with all equipment, controls/instrumentation, and accessories, the following but not limited to: 1. Primary Screening - New Rotary Drum Screens and Compactors to replace existing unit Storage Building - Modifications to an existing CMU Building to allow it to be used to store necessary materials and equipment for WCPW operations. Sludge Transfer Pumping System Addition of a liquid sludge transfer system inclusive of equipment, piping, controls and instrumentation to transfer sludge from the new Sludge Holding Tank to a dewatering means. Mechanical Dewatering System - New Unit Process inclusive of building to house mechanical dewatering device, dewater sludge conveyor(s) and ancillary equipment as well as piping, controls and instrumentation. Sludge Drying Beds and Greenhouses Rehabilitation and extension of existing Greenhouses and Drying Beds as well as the addition of two (2) new Drying Beds and Greenhouses. Sludge Holding Tanks . New above grade stainless steel tankage to serve as waste activated sludge (WAS) storage Associated yard piping and site work. Replacement of portions of the existing piping and installation of new piping. Associated electrical , controls, HVAC & plumbing work. HVAC, Electrical Equipment, and Plumbing in new structures. SCADA Installation of Connecting the existing SCADA system serving the new equipment with the existing WWTP SCADA system. The work under this Contract includes all requirements to provide a fully finished and operable wastewater treatment facility including miscellaneous items and incidentals as shall be indicated , shown , specified or required to complete the work in strict conformity with the Contract Documents. The Contractor shall provide all labor, equipment, tools, appliances, materials and incidentals, and shall perform all operations required to completely finish all of the work to the satisfaction of the Owner and the Engineer. The Contractor shall be obligated to furnish a complete and functioning facility. E. The existing WWTP treats sewage from the service area of the Mystic Harbour WWTP. The work under this Contract constitutes a major renovation of this treatment facility; however, the Contractor's attention is directed to the fact that wastewater service to the Mystic Harbour WWTP must be maintained throughout the construction period and only interrupted temporarily during yard piping tie-ins. At no time can wastewater service be cut off without the prior written approval of Worcester County Public Works. Any interruption to service must be kept to the shortest duration possible and with the approval of the County

GC Bidding

$3,000,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
45
Bidding Soon
760
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 10, 2026

February 1, 2027

Project location map

9616 Stephen Decatur Highway, Ocean City, MD


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed