Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 5, 2026 at 7:00 PM

Updated November 7, 2026

Demolition, site work and paving for a mixed-use development in Center City, Minnesota. Completed plans call for the demolition of a playground / park / athletic field; road / highway; and sidewalk / parking lot.

General construction including excavation, embankment, bituminous surfacing, erosion control, and turf establishment at Wild River State Park. Bonds: 5% Bid Bond, 100% Performance Bond, 100% Payment Bond. QA date - 11/17/2026 Project technical information is available from Yancey J. Stam; Telephone number: 651-259-5804; Email: yancey.stam@state.mn.us

GC Bidding

$1,226,179.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
236
Active Projects
98
Bidding Soon
1,560
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 24, 2026

January 25, 2027

Project location map

Multiple Locations, Center City, MN

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed