Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 6, 2026 at 7:00 PM

Updated November 8, 2026

Site work and paving for a mixed-use development in Chipley, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This project primarily consists of roadway and drainage improvements on Pecan Street from South Blvd to Church Ave within the City of Chipley. Roadway improvements include complete reconstruction of the existing paved roadway with the addition of concrete drop-curb along both sides and new concrete driveways and isolated sections of concrete sidewalk replacement. Drainage improvements consist of replacement of drainage culvert end treatments and addition of concrete ditch pavement and rip-rap rubble. Signing and pavement markings are also included with thermoplastic striping being placed on the final asphalt surface. This project also includes minor utility work consisting of valve and manhole adjustments. The Owner reserves the right to waive any informality or to reject any or all bids. Each Bidder must deposit with his/her bid, security in the amount, form and subject to the conditions provided in the Information for Bidders. Sureties used for obtaining bonds must appear as acceptable according to the Department of Treasury Circular 570.

GC Bidding

$1,531,003.00

Public - City

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
43
Bidding Soon
622
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2026

February 15, 2027

Project location map

Pecan St, Chipley, FL

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed