Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 10, 2026 at 7:00 PM

Updated November 14, 2026

Renovation of a multi-residential development in East Moline, Illinois. Completed plans call for the renovation of a multi-residential development.

Home repairs and accessibility improvements for residential property. Question Cuttoff Date & Time 11/18/2026 03:30:00 PM (ET) Questions about the project, specifications, gaining access to the project, or the bidding process may be directed to Chris Day, Housing Construction Specialist @ 309-524-2053. Remove and replace deteriorated non-functioning double hung windows on Main Level of home. There are a total of 10 windows in need of improvements. Windows in the home look well maintained. They have deteriorated over time. The windows do not close all the way due to warping, the locking mechanisms do not always work and the sash framing is separating from years of sun and moisture. The seal on the bottom sash has moved and no longer provides a proper moisture barrier or insulation. Field measure, order and install a vinyl , double hung, double glazed, one-over-one window and jamb including screen. Caulk, interior casing and exterior trim. Prime and paint interior trim. Wrap exterior trim in aluminum. Window Locations: Side A - A 1 ,A2,A3 Living Room A4 Bedroom Side B - B1 Bedroom B2 Bedroom Side C - C1 Bedroom C2 Bathroom(tempered/opaque) C3 Kitchen Side D - D1 Living Room 2986 Window-Vinyl Basement Slider Remove and replace non functioning wooden single pane window in basement bedroom. Windows are severely deteriorated allowing moisture to enter the basement. Field measure, order and install a vinyl awning double glazed, single lite basement window with screen. Wrap exterior in aluminum and caulk if able.complete concrete sill when replacing in concrete block foundation, prime and top coat all trim.Location: 2-Interior Trade: 21 6032 Furnace-Gas Replacement 80,000 BTU Replace 30+ year old failing furnace. The average life expectancy of a furnace is between 15 and 20 years. This furnace is date to 1996. Unit has outlived use. Install an 80,000 BTU, intermittent pilot, gas fired, forced air, furnace to existing plenum and gas line. Include power humidifier, set pack controls, flue pipe, and new shut-off valve. Connect thimble breaching to chimney per code. Provide separate power circuit and operating manual. System to maintain 70F indoor temp when outside temp is -10 F min AFUE rating of 86.

Sub-Bidding

$450,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
80
Bidding Soon
1,128
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2026

December 21, 2026

Project location map

3403 2nd St, East Moline, IL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed