Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 12, 2026 at 7:00 PM
Updated November 13, 2026
Site work and renovation of a bridge / tunnel in Horton, Michigan. Completed plans call for the renovation of a bridge / tunnel.
Removal of existing 56 feet of 12-inch diameter culvert and installation of 56 feet of 48-inch diameter poly coated CMP culvert at an unnamed tributary to the Manistee River. Remove existing 56' of 12" diameter culvert and replace with 56' of 48" diameter poly coated CMP culvert on 12 Rd at un-named tributary to the Manistee River. Section 30, Hanover Township, Wexford County. The project site is on 12 Rd at Un-named tributary to Manistee River, Hanover Township, Section 30, Wexford County, Michigan. This crossing is located just under 1 mile east of the M-37 and 12 Rd intersection and approximately 1,000' west of where 12 Rd becomes 15 Rd. The location has been closed with barricades. There is a sinkhole formed in the road, and the downstream front slope has been undermined severely. Remove existing 56' of 12" diameter CMP culvert. Placement of 56' of 48" diameter poly coated CMP culvert, at the un-named tributary. The work of this contract involves the removal of the existing culvert and placement of a new poly coated CMP culvert per the attached plans. The existing culvert is very steep. The new culvert will have the downstream invert raised and fill placed to flatten the slope of the structure. The stream downstream of the culvert will have bank rock placed in the washed out area to stabilize the slopes and flatten the stream bottom grade. The contractor will be responsible for all items of work listed in the Bid Proposal and shown in the plans, including any required dewatering. The contractor will provide a plan to control the flow of water during construction of the culvert. This dewatering plan must be approved by the Road Commission Engineer prior to any construction on this project. The cost of dewatering is to be included in the Lump Sum price of culvert replacement. Restoration will be required on all disturbed areas. This road is a seasonal road and has been closed by signage and may require additional traffic control items for these operations at no additional cost. There is a sinkhole in the road and the front slope on the downstream side is washed out and undermined as well. The road will continue to be closed until completion of the culvert installation and slope restoration. Contractor is responsible for maintaining existing signage and barricades during construction.
GC Bidding
$150,000.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 24, 2026
December 16, 2026
US-12, Horton, MI
Related To This Project
Horton, MI
Bid Date: Oct 05 2026
Horton, MI
Bid Date: Oct 05 2026
Horton, MI
--
Horton, MI
--
Horton, MI
Bid Date: Apr 29 2026
Horton, MI
Bid Date: Jun 06 2025
Horton, MI
Bid Date: Jan 27 2025
Horton, MI
Bid Date: Nov 29 2024
Horton, MI
Bid Date: Mar 19 2024
Horton, MI
Bid Date: Mar 19 2024
Ann Arbor, MI
--
Saint Johns, MI
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed