Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 12, 2026 at 7:00 PM

Updated November 18, 2026

Site work and renovation of an educational facility in Athens, West Virginia. Completed plans call for the renovation of a educational facility; and for site work for a educational facility.

Removal, disposal, and replacement of existing ballast and roof systems, including installation of plywood decking, synthetic underlayment, ice and water shields, and 24-gauge standing seam metal roof panels with associated flashings at Grant House. 100 1st Avenue - Grant House a . Load materials onto the roof and set up necessary safety equipment . b . Attach new 3/4" plywood over the existing tiles . c. Cover the entire roof area in synthetic underlayment and ice and water shield at the eave . d. This is a true standing seam roof system, and the panels will be formed onsite . e . Fabricate and install new 24 - gauge Kynar finished drip edge , rake edge, ridge edge, step flashing and end panel flashing. f. All flashing to be locked together along with the metal panels creating a leak-free, maintenance free roof system . g. Provide and install new snow guards on the eave. One per panel staggard. h. Upon completion of the roof project remove all job-related materials and debris. i. All work is to be completed per the manufacturer's specifications. j. Please provide warranty details upon completion. First Avenue - Marsh House a. Load materials onto the roof and set up necessary safety equipment. b. Inspect the decking and replace deteriorated plywood. c. Cover the entire roof area in synthetic underlayment and ice and water shield atthe eave. d. Fabricate and install new double locked 24-gauge Kynar finished roof panels. This is a true standing seam roof system, and the panels will be formed onsite. e. Fabricate and install new 24 -gauge Kynar finished drip edge, rake edge, ridge edge, step flashing and end panel flashing. f. All flashing to be locked together along with the metal panels creating a leak-free, maintenance free roof system. g. Provide and install new snow guards on the eave. One per panel staggard. h. Upon completion of the roof project remove all job-related materials and debris. i. All work is to be completed per the manufacturer's specifications. j. Please provide warranty details upon completion. 502 Vermillion Street a. Load materials onto the roof and set up necessary safety equipment. b. Remove existing roof to deck and dispose of properly. c. Inspect the decking and replace any deteriorated decking as needed. d. Install ice water shield along the eaves, valleys and at chimneys. e. Install synthetic underlayment to remainder of roof deck. f. Install new drip edge at the eaves. g. Install limited lifetime architectural shingles per manufacture's guidelines. h. Install new shingle over ridge vent. i. Replace all pipe boots. j. Run a nail magnet around building perimeter. k. Remove and dispose of all roof related debris. 1. Please provide warranty details upon completion. 305 Plymouth Avenue a. Load materials onto the roof and set up the necessary safety equipment. b. Attach new 3/4" plywood over the existing tiles with vapor barrier. c. Cover the entire roof area in synthetic underlayment and ice and water shield at the eave. d. Fabricate and install new double locked 24-gauge Kynar finished roof panels. This is a true standing seam roof system, and the panels will be formed onsite. e. Fabricate and install new 24 -gauge Kynar finished drip edge, rake edge, ridge edge, step flashing and end panel flashing. f. All flashing to be locked together along with the metal panels creating a leak-free, maintenance free roof system . g. Provide and install new snow guards on the eave. One per panel staggard. h. Upon completion of the roof project remove all job-related materials and debris. i. All work is to be completed per the manufacturer's specifications. j. Please provide warranty details upon completion. Science Building a. Load materials onto the roof and set up the necessary safety equipment. b. Sweep the existing roof and dispose of the loose gravel. c. Replace any wet or deteriorated insulation found on the roof. d. Loose lay new 1/2 " dens deck insulation. e. Install new .060 EPDM vaccu-seal roof system and required accessories. f. Flash all walls, projections, penetrations and roof curbs in accordance with the manufacture's specifications. g. Wall flashing to extend up and over the wall cap. h. Install new wood nailers on top of the walls and new 24 -gauge Kynar finished, edge metal. Concord University will choose color. i. Upon completion of the roof project remove all job-related materials and debris. j. Please provide warranty details upon completion. Maintenance Building - Area A a. Load materials onto the roof and set up the necessary safety equipment. b. Remove and dispose of the existing EPDM membrane, flashings and insulation down to but excluding the deck. c . Remove and replace any deteriorated decking with 3/4 " plywood. d. Over the prepared rood, adhere new 2" polyisocyanurate insulation to the deck in accordance with the manufacturer's specifications. e. Over the applied insulation install a new .060 fully adhered EPDM roof system. f. Flash all walls , projections, penetrations and roof curbs in accordance with the manufacture's specifications. g. Install new 24-gauge Kynar finished, edge metal where applicable. Concord University will choose color. h. Upon completion of the roof project remove all job-related materials and debris. i . Please provide warranty details upon completion. Maintenance Building - Area B - a. Load materials onto the roof and set up the necessary safety equipment. b. Sweep existing rood and dispose of loose gravel. c. Remove and replace any wet roofing material . d. Remove and replace any deteriorated decking with 3/4" plywood. e. Over the prepared rood, loose lay new 1/2 " dens-deck. f. Over the applied insulation install new .060 EPDM vaccu-seal roof system. g. Flash all walls, projections, penetrations and roof curbs in accordance with the manufacture's specifications. h. Install new 24- gauge Kynar finished, edge metal where applicable. Concord University will choose color i. Upon completion of the roof project remove all job-related materials and debris. j. Please provide warranty details upon completion. Maintenance Building - Area C - a. Load materials onto the roof and set up the necessary safety equipment. b. Remove and dispose of the existing EPDM membrane, flashings and insulation down to but excluding the deck. c. Remove and replace any deteriorated decking with 3/4" plywood. d. Over the prepared rood, adhere new 2" polyisocyanurate insulation to the deck in accordance with the manufacturer's specifications. e. Over the applied insulation install a new .060 fully adhered EPDM roof system. f. Flash all walls, projections, penetrations and roof curbs in accordance with the manufacture's specifications. g. Install new 24-gauge Kynar finished, edge metal where applicable. Concord University will choose color. h. Upon completion of the roof project remove all job-related materials and debris. i. Please provide warranty details upon completion. Maintenance Building - Area D - a. Load materials onto the roof and set up the necessary safety equipment. b. Remove and dispose of the existing EPDM membrane, flashings and insulation down to but excluding the deck. c. Remove and replace any deteriorated decking with 3/4 " plywood. d. Over the prepared rood, adhere new 2" polyisocyanurate insulation to the deck in accordance with the manufacturer's specifications. e. Over the applied insulation install a new .060 fully adhered EPDM roof system. f. Flash all walls, projections, penetrations and roof curbs in accordance with the manufacture's specifications. g. Install new 24-gauge Kynar finished, edge metal where applicable. Concord University will choose color. h. Upon completion of the roof project remove all job-related materials and debris. i. Please provide warranty details upon completion. Witherspoon - Building #1 a. Load materials onto the roof and setup the necessary safety equipment. b. Remove and dispose of the existing shingle roof system down to but excluding the deck. c. Remove and replace any deteriorated decking. d. Cover the entire roof area in synthetic underlayment and ice and water shield at the eaves. e. Fabricate and install new double locked 24-gauge Kynar finished roof panels. This is a true standing seam roof system, and the panels will be formed onsite. f. Fabricate and install new 24 -gauge Kynar finished drip edge, rake edge, ridge edge, step flashing, counterflashing and sidewall flashing. g. All flashing to be locked together along with the metal panels creating a leak-free, maintenance free roof system. h. Provide and install new snow guards on the eave. One per panel staggard. i . Upon completion of the roof project remove all job-related materials and debris. j. All work is to be completed per the manufacturer's specifications. k. Please provide warranty details upon completion. Witherspoon - Building #2 a. Load materials onto the roof and set up the necessary safety equipment. b. Remove and dispose of the existing shingle roof system down to but excluding the deck. c. Remove and replace any deteriorated decking. d. Cover the entire roof area in synthetic underlayment and ice and water shield at the eaves. e. Fabricate and install new double locked 24-gauge Kynar finished roof panels. This is a true standing seam roof system, and the panels will be formed onsite. f. Fabricate and install new 24-gauge Kynar finished drip edge, rake edge, ridge edge, step flashing, counterflashing and sidewall flashing. g. All flashing to be locked together along with the metal panels creating a leak-free, maintenance free roof system. h. Provide and install new snow guards on the eave. One per panel staggard. i. Upon completion of the roof project remove all job-related materials and debris. j. All work is to be completed per the manufacturer's specifications. k. Please provide warranty details upon completion. Witherspoon - Building #3A a. Load materials onto the roof and set up the necessary safety equipment. b. Remove and dispose of the existing shingle roof system down to but excluding the deck. c. Remove and replace any deteriorated decking. d. Cover the entire roof area in synthetic underlayment and ice and water shield at the eaves. e. Fabricate and install new double locked 24-gauge Kynar finished roof panels. This is a true standing seam roof system, and the panels will be formed onsite. f. Fabricate and install new 24-gauge Kynar finished drip edge, rake edge, ridge edge, step flashing, counterflashing and sidewall flashing. g. All flashing to be locked together along with the metal panels creating a leak-free, maintenance free roof system . h. Provide and install new snow guards on the eave. One per panel staggard. i . Upon completion of the roof project remove all job-related materials and debris. j. All work is to be completed per the manufacturer's specifications. k. Please provide warranty details upon completion. Witherspoon - Building #3B a. Load materials onto the roof and set up the necessary safety equipment. b. Remove and dispose of the existing shingle roof system down to but excluding the deck. c. Remove and replace any deteriorated decking. d. Cover the entire roof area in synthetic underlayment and ice and water shield at the eaves. e. Fabricate and install new double locked 24-gauge Kynar finished roof panels. This is a true standing seam roof system, and the panels will be formed onsite. f. Fabricate and install new 24-gauge Kynar finished drip edge, rake edge, ridge edge, step flashing, counterflashing and sidewall flashing. g. All flashing to be locked together along with the metal panels creating a leak-free, maintenance free roof system. h. Provide and install new snow guards on the eave. One per panel staggard. i . Upon completion of the roof project remove all job-related materials and debris. j. All work is to be completed per the manufacturer's specifications. k. Please provide warranty details upon completion. Witherspoon - Building #4 a. Load materials onto the roof and set up the necessary safety equipment. b. Remove and dispose of the existing shingle roof system down to but excluding the deck. c. Remove and replace any deteriorated decking. d. Cover the entire roof area in synthetic underlayment and ice and water shield at the eaves. e. Fabricate and install new double locked 24-gauge Kynar finished roof panels. This is a true standing seam roof system, and the panels will be formed onsite. f. Fabricate and install new 24-gauge Kynar finished drip edge, rake edge, ridge edge, step flashing, counterflashing and sidewall flashing. g. All flashing to be locked together along with the metal panels creating a leak-free, maintenance free roof system . h. Provide and install new snow guards on the eave. One per panel staggard. i . Upon completion of the roof project remove all job-related materials and debris. j. All work is to be completed per the manufacturer's specifications. k. Please provide warranty details upon completion. Witherspoon - Building #5 a. Load materials onto the roof and set up the necessary safety equipment. b. Remove and dispose of the existing shingle roof system down to but excluding the deck. c. Remove and replace any deteriorated decking. d. Cover the entire roof area in synthetic underlayment and ice and water shield at the eaves. e. Fabricate and install new double locked 24-gauge Kynar finished roof panels. This is a true standing seam roof system, and the panels will be formed onsite. f. Fabricate and install new 24-gauge Kynar finished drip edge, rake edge, ridge edge, step flashing, counterflashing and sidewall flashing. g. All flashing to be locked together along with the metal panels creating a leak-free, maintenance free roof system . h. Provide and install new snow guards on the eave. One per panel staggard. i . Upon completion of the roof project remove all job-related materials and debris. j. All work is to be completed per the manufacturer's specifications. k. Please provide warranty details upon completion. Submit Questions to: Andrea Webb, Director of Procurement - procurement@concord.edu Question Submission Deadline: 4:00 PM Monday, November 23 , 2026

GC Bidding

$450,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
56
Bidding Soon
846
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2026

January 7, 2027

Project location map

Multiple Locations, Athens, WV

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed