Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 12, 2026 at 7:00 PM
Updated November 18, 2026
Site work and renovation of an educational facility in Athens, West Virginia. Completed plans call for the renovation of a educational facility; and for site work for a educational facility.
Removal, disposal, and replacement of existing ballast and roof systems, including installation of plywood decking, synthetic underlayment, ice and water shields, and 24-gauge standing seam metal roof panels with associated flashings at Grant House. 100 1st Avenue - Grant House a . Load materials onto the roof and set up necessary safety equipment . b . Attach new 3/4" plywood over the existing tiles . c. Cover the entire roof area in synthetic underlayment and ice and water shield at the eave . d. This is a true standing seam roof system, and the panels will be formed onsite . e . Fabricate and install new 24 - gauge Kynar finished drip edge , rake edge, ridge edge, step flashing and end panel flashing. f. All flashing to be locked together along with the metal panels creating a leak-free, maintenance free roof system . g. Provide and install new snow guards on the eave. One per panel staggard. h. Upon completion of the roof project remove all job-related materials and debris. i. All work is to be completed per the manufacturer's specifications. j. Please provide warranty details upon completion. First Avenue - Marsh House a. Load materials onto the roof and set up necessary safety equipment. b. Inspect the decking and replace deteriorated plywood. c. Cover the entire roof area in synthetic underlayment and ice and water shield atthe eave. d. Fabricate and install new double locked 24-gauge Kynar finished roof panels. This is a true standing seam roof system, and the panels will be formed onsite. e. Fabricate and install new 24 -gauge Kynar finished drip edge, rake edge, ridge edge, step flashing and end panel flashing. f. All flashing to be locked together along with the metal panels creating a leak-free, maintenance free roof system. g. Provide and install new snow guards on the eave. One per panel staggard. h. Upon completion of the roof project remove all job-related materials and debris. i. All work is to be completed per the manufacturer's specifications. j. Please provide warranty details upon completion. 502 Vermillion Street a. Load materials onto the roof and set up necessary safety equipment. b. Remove existing roof to deck and dispose of properly. c. Inspect the decking and replace any deteriorated decking as needed. d. Install ice water shield along the eaves, valleys and at chimneys. e. Install synthetic underlayment to remainder of roof deck. f. Install new drip edge at the eaves. g. Install limited lifetime architectural shingles per manufacture's guidelines. h. Install new shingle over ridge vent. i. Replace all pipe boots. j. Run a nail magnet around building perimeter. k. Remove and dispose of all roof related debris. 1. Please provide warranty details upon completion. 305 Plymouth Avenue a. Load materials onto the roof and set up the necessary safety equipment. b. Attach new 3/4" plywood over the existing tiles with vapor barrier. c. Cover the entire roof area in synthetic underlayment and ice and water shield at the eave. d. Fabricate and install new double locked 24-gauge Kynar finished roof panels. This is a true standing seam roof system, and the panels will be formed onsite. e. Fabricate and install new 24 -gauge Kynar finished drip edge, rake edge, ridge edge, step flashing and end panel flashing. f. All flashing to be locked together along with the metal panels creating a leak-free, maintenance free roof system . g. Provide and install new snow guards on the eave. One per panel staggard. h. Upon completion of the roof project remove all job-related materials and debris. i. All work is to be completed per the manufacturer's specifications. j. Please provide warranty details upon completion. Science Building a. Load materials onto the roof and set up the necessary safety equipment. b. Sweep the existing roof and dispose of the loose gravel. c. Replace any wet or deteriorated insulation found on the roof. d. Loose lay new 1/2 " dens deck insulation. e. Install new .060 EPDM vaccu-seal roof system and required accessories. f. Flash all walls, projections, penetrations and roof curbs in accordance with the manufacture's specifications. g. Wall flashing to extend up and over the wall cap. h. Install new wood nailers on top of the walls and new 24 -gauge Kynar finished, edge metal. Concord University will choose color. i. Upon completion of the roof project remove all job-related materials and debris. j. Please provide warranty details upon completion. Maintenance Building - Area A a. Load materials onto the roof and set up the necessary safety equipment. b. Remove and dispose of the existing EPDM membrane, flashings and insulation down to but excluding the deck. c . Remove and replace any deteriorated decking with 3/4 " plywood. d. Over the prepared rood, adhere new 2" polyisocyanurate insulation to the deck in accordance with the manufacturer's specifications. e. Over the applied insulation install a new .060 fully adhered EPDM roof system. f. Flash all walls , projections, penetrations and roof curbs in accordance with the manufacture's specifications. g. Install new 24-gauge Kynar finished, edge metal where applicable. Concord University will choose color. h. Upon completion of the roof project remove all job-related materials and debris. i . Please provide warranty details upon completion. Maintenance Building - Area B - a. Load materials onto the roof and set up the necessary safety equipment. b. Sweep existing rood and dispose of loose gravel. c. Remove and replace any wet roofing material . d. Remove and replace any deteriorated decking with 3/4" plywood. e. Over the prepared rood, loose lay new 1/2 " dens-deck. f. Over the applied insulation install new .060 EPDM vaccu-seal roof system. g. Flash all walls, projections, penetrations and roof curbs in accordance with the manufacture's specifications. h. Install new 24- gauge Kynar finished, edge metal where applicable. Concord University will choose color i. Upon completion of the roof project remove all job-related materials and debris. j. Please provide warranty details upon completion. Maintenance Building - Area C - a. Load materials onto the roof and set up the necessary safety equipment. b. Remove and dispose of the existing EPDM membrane, flashings and insulation down to but excluding the deck. c. Remove and replace any deteriorated decking with 3/4" plywood. d. Over the prepared rood, adhere new 2" polyisocyanurate insulation to the deck in accordance with the manufacturer's specifications. e. Over the applied insulation install a new .060 fully adhered EPDM roof system. f. Flash all walls, projections, penetrations and roof curbs in accordance with the manufacture's specifications. g. Install new 24-gauge Kynar finished, edge metal where applicable. Concord University will choose color. h. Upon completion of the roof project remove all job-related materials and debris. i. Please provide warranty details upon completion. Maintenance Building - Area D - a. Load materials onto the roof and set up the necessary safety equipment. b. Remove and dispose of the existing EPDM membrane, flashings and insulation down to but excluding the deck. c. Remove and replace any deteriorated decking with 3/4 " plywood. d. Over the prepared rood, adhere new 2" polyisocyanurate insulation to the deck in accordance with the manufacturer's specifications. e. Over the applied insulation install a new .060 fully adhered EPDM roof system. f. Flash all walls, projections, penetrations and roof curbs in accordance with the manufacture's specifications. g. Install new 24-gauge Kynar finished, edge metal where applicable. Concord University will choose color. h. Upon completion of the roof project remove all job-related materials and debris. i. Please provide warranty details upon completion. Witherspoon - Building #1 a. Load materials onto the roof and setup the necessary safety equipment. b. Remove and dispose of the existing shingle roof system down to but excluding the deck. c. Remove and replace any deteriorated decking. d. Cover the entire roof area in synthetic underlayment and ice and water shield at the eaves. e. Fabricate and install new double locked 24-gauge Kynar finished roof panels. This is a true standing seam roof system, and the panels will be formed onsite. f. Fabricate and install new 24 -gauge Kynar finished drip edge, rake edge, ridge edge, step flashing, counterflashing and sidewall flashing. g. All flashing to be locked together along with the metal panels creating a leak-free, maintenance free roof system. h. Provide and install new snow guards on the eave. One per panel staggard. i . Upon completion of the roof project remove all job-related materials and debris. j. All work is to be completed per the manufacturer's specifications. k. Please provide warranty details upon completion. Witherspoon - Building #2 a. Load materials onto the roof and set up the necessary safety equipment. b. Remove and dispose of the existing shingle roof system down to but excluding the deck. c. Remove and replace any deteriorated decking. d. Cover the entire roof area in synthetic underlayment and ice and water shield at the eaves. e. Fabricate and install new double locked 24-gauge Kynar finished roof panels. This is a true standing seam roof system, and the panels will be formed onsite. f. Fabricate and install new 24-gauge Kynar finished drip edge, rake edge, ridge edge, step flashing, counterflashing and sidewall flashing. g. All flashing to be locked together along with the metal panels creating a leak-free, maintenance free roof system. h. Provide and install new snow guards on the eave. One per panel staggard. i. Upon completion of the roof project remove all job-related materials and debris. j. All work is to be completed per the manufacturer's specifications. k. Please provide warranty details upon completion. Witherspoon - Building #3A a. Load materials onto the roof and set up the necessary safety equipment. b. Remove and dispose of the existing shingle roof system down to but excluding the deck. c. Remove and replace any deteriorated decking. d. Cover the entire roof area in synthetic underlayment and ice and water shield at the eaves. e. Fabricate and install new double locked 24-gauge Kynar finished roof panels. This is a true standing seam roof system, and the panels will be formed onsite. f. Fabricate and install new 24-gauge Kynar finished drip edge, rake edge, ridge edge, step flashing, counterflashing and sidewall flashing. g. All flashing to be locked together along with the metal panels creating a leak-free, maintenance free roof system . h. Provide and install new snow guards on the eave. One per panel staggard. i . Upon completion of the roof project remove all job-related materials and debris. j. All work is to be completed per the manufacturer's specifications. k. Please provide warranty details upon completion. Witherspoon - Building #3B a. Load materials onto the roof and set up the necessary safety equipment. b. Remove and dispose of the existing shingle roof system down to but excluding the deck. c. Remove and replace any deteriorated decking. d. Cover the entire roof area in synthetic underlayment and ice and water shield at the eaves. e. Fabricate and install new double locked 24-gauge Kynar finished roof panels. This is a true standing seam roof system, and the panels will be formed onsite. f. Fabricate and install new 24-gauge Kynar finished drip edge, rake edge, ridge edge, step flashing, counterflashing and sidewall flashing. g. All flashing to be locked together along with the metal panels creating a leak-free, maintenance free roof system. h. Provide and install new snow guards on the eave. One per panel staggard. i . Upon completion of the roof project remove all job-related materials and debris. j. All work is to be completed per the manufacturer's specifications. k. Please provide warranty details upon completion. Witherspoon - Building #4 a. Load materials onto the roof and set up the necessary safety equipment. b. Remove and dispose of the existing shingle roof system down to but excluding the deck. c. Remove and replace any deteriorated decking. d. Cover the entire roof area in synthetic underlayment and ice and water shield at the eaves. e. Fabricate and install new double locked 24-gauge Kynar finished roof panels. This is a true standing seam roof system, and the panels will be formed onsite. f. Fabricate and install new 24-gauge Kynar finished drip edge, rake edge, ridge edge, step flashing, counterflashing and sidewall flashing. g. All flashing to be locked together along with the metal panels creating a leak-free, maintenance free roof system . h. Provide and install new snow guards on the eave. One per panel staggard. i . Upon completion of the roof project remove all job-related materials and debris. j. All work is to be completed per the manufacturer's specifications. k. Please provide warranty details upon completion. Witherspoon - Building #5 a. Load materials onto the roof and set up the necessary safety equipment. b. Remove and dispose of the existing shingle roof system down to but excluding the deck. c. Remove and replace any deteriorated decking. d. Cover the entire roof area in synthetic underlayment and ice and water shield at the eaves. e. Fabricate and install new double locked 24-gauge Kynar finished roof panels. This is a true standing seam roof system, and the panels will be formed onsite. f. Fabricate and install new 24-gauge Kynar finished drip edge, rake edge, ridge edge, step flashing, counterflashing and sidewall flashing. g. All flashing to be locked together along with the metal panels creating a leak-free, maintenance free roof system . h. Provide and install new snow guards on the eave. One per panel staggard. i . Upon completion of the roof project remove all job-related materials and debris. j. All work is to be completed per the manufacturer's specifications. k. Please provide warranty details upon completion. Submit Questions to: Andrea Webb, Director of Procurement - procurement@concord.edu Question Submission Deadline: 4:00 PM Monday, November 23 , 2026
GC Bidding
$450,000.00
Public - State/Provincial
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 8, 2026
January 7, 2027
Multiple Locations, Athens, WV
Related To This Project
Athens, WV
Bid Date: Dec 04 2026
Athens, WV
Bid Date: Sep 14 2026
Athens, WV
Bid Date: Aug 26 2026
Athens, WV
Bid Date: Jul 14 2026
Athens, WV
Bid Date: Jul 13 2026
Athens, WV
Bid Date: Feb 05 2026
Athens, WV
Bid Date: Oct 21 2025
Athens, WV
Bid Date: Jun 23 2025
Athens, WV
Bid Date: Apr 29 2025
Athens, WV
--
Athens, WV
Bid Date: Jan 07 2025
Athens, WV
Bid Date: Nov 25 2024
Athens, WV
Bid Date: Sep 17 2024
Athens, WV
Bid Date: Jun 20 2024
Athens, WV
Bid Date: Jun 12 2024
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed