Site work and new construction of a mixed-use development in Baraboo, Wisconsin. Completed plans call for the construction of a water / sewer project; municipal facility; and water / sewer project.

Construction of Municipal Wellhouse 8 and Final Well 8. Work includes masonry wellhouse structure, vertical turbine well pump and motor, natural gas generator set, chemical feed systems, process piping and valves, mechanical, electrical, instrumentation and control system integration, underground water and sanitary sewer utilities, asphalt paving, site restoration, and construction of a rock-walled, potable water well. Bonds: 5% Bid Bond, Certified Check required, Performance Bond required (unspecified amount), Payment Bond required (unspecified amount). The Project includes the following Work: Construction of Municipal Wellhouse # 8 and Final Well #8. The wellhouse facility will generally include construction of a masonry wellhouse structure, including the furnishing and installing of a vertical turbine well pump and motor, natural gas generator set, chemical feed systems, process piping and valves, mechanical , electrical , instrumentation and control system integration, underground water and sanitary sewer utilities, asphalt paving and all related site restoration . The final well generally includes construction of a rock-walled, potable water well and associated test pumping and water quality sampling. Final Well # 8 This project consists of the construction, test pumping, water sampling and laboratory testing of one municipal , rock-walled well (Well # 8) in the Village of Lake Delton . It is the intent of this project manual that the Owner will be provided one sand free potable municipal water supply well meeting the requirements of the Wisconsin Administrative Code NR811. Test Well Abandonment: a. Upon completion of the new well construction and test pumping, the Contractor shall abandon the test well in accordance with Wisconsin Administrative Code NR811. Wellhouse # 8 The project consists of the construction of a wellhouse in the Village of Lake Delton. The project includes the construction of a masonry block building with mechanical , plumbing, HVAC, electrical, and SCADA integration systems, as well as yard piping, site filling and grading, asphalt pavement, erosion control, and restoration. All work shall be performed in a first-class manner by qualified workmen . Wellhouse # 8 a. The project shall provide new wellhouse including but not limited to the following: construction of building , vertical turbine well pump and motor, well head, valves, water meter; check valve; pressure release valve; air release valves; process piping; pressure gauges and sampling taps, and all related construction and appurtenances as shown on the plans, specified herein and/or as required to provide a complete and functional system that complies with all applicable codes and regulations. 4. Yard Piping a. 5. Utilities a. The project includes, but is not limited to, extending water main, water service, low pressure sanitary sewer forcemain, grinder station , sanitary lateral , and stormwater piping as shown on the plans. The project includes, but is not limited to, coordination and construction required to upgrade and provide the required Utilities: 1) Electric 2) 3) 4) Natural Gas Internet (Fiber) Phone 6. Electrical Construction a. b. The project includes coordinating the installation of underground electric service to the building. The project includes all electrical equipment and accessories for motor control , distribution and lighting for the building . The project includes the following operational control systems improvements: d. Wellhouse- Provide and install all controls, as required to provide complete and functional systems. Integration to the Master SCADA Unit. The project includes supplying a permanently installed natural gas fueled standby engine and all related appurtenances, to provide an auxiliary power source for the well pump and all other equipment at the wellhouse requiring electrical power. Question Deadline 12/10/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Scott Chilson, PE, (608) 355-8868 | schilson@msa-ps.com

GC Bidding

$3,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
50
Bidding Soon
1,240
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2026

February 15, 2027

Project location map

Co Hwy A, Baraboo, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed