Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 17, 2026 at 7:00 PM
Updated November 21, 2026
Site work and new construction of a mixed-use development in Baraboo, Wisconsin. Completed plans call for the construction of a water / sewer project; municipal facility; and water / sewer project.
Construction of Municipal Wellhouse 8 and Final Well 8. Work includes masonry wellhouse structure, vertical turbine well pump and motor, natural gas generator set, chemical feed systems, process piping and valves, mechanical, electrical, instrumentation and control system integration, underground water and sanitary sewer utilities, asphalt paving, site restoration, and construction of a rock-walled, potable water well. Bonds: 5% Bid Bond, Certified Check required, Performance Bond required (unspecified amount), Payment Bond required (unspecified amount). The Project includes the following Work: Construction of Municipal Wellhouse # 8 and Final Well #8. The wellhouse facility will generally include construction of a masonry wellhouse structure, including the furnishing and installing of a vertical turbine well pump and motor, natural gas generator set, chemical feed systems, process piping and valves, mechanical , electrical , instrumentation and control system integration, underground water and sanitary sewer utilities, asphalt paving and all related site restoration . The final well generally includes construction of a rock-walled, potable water well and associated test pumping and water quality sampling. Final Well # 8 This project consists of the construction, test pumping, water sampling and laboratory testing of one municipal , rock-walled well (Well # 8) in the Village of Lake Delton . It is the intent of this project manual that the Owner will be provided one sand free potable municipal water supply well meeting the requirements of the Wisconsin Administrative Code NR811. Test Well Abandonment: a. Upon completion of the new well construction and test pumping, the Contractor shall abandon the test well in accordance with Wisconsin Administrative Code NR811. Wellhouse # 8 The project consists of the construction of a wellhouse in the Village of Lake Delton. The project includes the construction of a masonry block building with mechanical , plumbing, HVAC, electrical, and SCADA integration systems, as well as yard piping, site filling and grading, asphalt pavement, erosion control, and restoration. All work shall be performed in a first-class manner by qualified workmen . Wellhouse # 8 a. The project shall provide new wellhouse including but not limited to the following: construction of building , vertical turbine well pump and motor, well head, valves, water meter; check valve; pressure release valve; air release valves; process piping; pressure gauges and sampling taps, and all related construction and appurtenances as shown on the plans, specified herein and/or as required to provide a complete and functional system that complies with all applicable codes and regulations. 4. Yard Piping a. 5. Utilities a. The project includes, but is not limited to, extending water main, water service, low pressure sanitary sewer forcemain, grinder station , sanitary lateral , and stormwater piping as shown on the plans. The project includes, but is not limited to, coordination and construction required to upgrade and provide the required Utilities: 1) Electric 2) 3) 4) Natural Gas Internet (Fiber) Phone 6. Electrical Construction a. b. The project includes coordinating the installation of underground electric service to the building. The project includes all electrical equipment and accessories for motor control , distribution and lighting for the building . The project includes the following operational control systems improvements: d. Wellhouse- Provide and install all controls, as required to provide complete and functional systems. Integration to the Master SCADA Unit. The project includes supplying a permanently installed natural gas fueled standby engine and all related appurtenances, to provide an auxiliary power source for the well pump and all other equipment at the wellhouse requiring electrical power. Question Deadline 12/10/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Scott Chilson, PE, (608) 355-8868 | schilson@msa-ps.com
GC Bidding
$3,000,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 17, 2026
February 15, 2027
Co Hwy A, Baraboo, WI
Related To This Project
Baraboo, WI
--
Baraboo, WI
Bid Date: Dec 01 2026
Baraboo, WI
--
Baraboo, WI
Bid Date: Oct 29 2026
Baraboo, WI
--
Baraboo, WI
Bid Date: Aug 28 2026
Baraboo, WI
Bid Date: Sep 11 2026
Baraboo, WI
Bid Date: Jul 15 2026
Baraboo, WI
--
Baraboo, WI
Bid Date: Jun 16 2026
Baraboo, WI
Bid Date: Jun 16 2026
Baraboo, WI
Bid Date: Jun 25 2026
Baraboo, WI
Bid Date: Jul 15 2026
Baraboo, WI
Bid Date: May 13 2026
Baraboo, WI
Bid Date: May 18 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed